Page 119 - 捷運技術 第52期
P. 119

捷運技術 第52期                                            115



                 The Songshan line’s power supply system contains: DC traction power simulation, AC power
            transfer and supply study, AC analysis and verification of the response measure of the cases in

            which TAIPOWER cannot supply power to Songshan line BSS, 161kV BSS, 22kV SSS, and
            TSS power supply, a power remote control system (SCADA), a stray current monitoring system,
            22kV cable DTS, a DC cable high impedance detecting system and system integrated testing. The
            innovative practices in the design of the power supply system include: (1) multiple MRT line power
            supply backup plans (2) 161/ 22kV GIT applied in BSS, (3) an optical fiber temperature detecting
            system applied for 22kV cables in tunnels, (4) a high impedance detecting system applied on DC

            cables.
                 This article aims to introduce these important items of design and construction, and share the
            experience of the innovative design and construction of Songshan line’s power supply system.


            Keywords:MRT power supply system, power transfer, BSS, traction power, stray current,

                         system integration, GIT, temperature monitoring
   114   115   116   117   118   119   120   121   122   123   124