Page 223 - 捷運技術 第39期
P. 223
捷運技術半年刊 第39期 97年8月 217
臺北捷運軌道工程無道碴道床基座施工探討
魏道佳 鄭國雄 2
1
摘要
軌道基座係為提供鋼軌扣件固結鋼軌的承拖系統,本文乃以板南線臺北車站以東採用鋼
框模系統模板及土城線選用GSF模具比較兩種施築工法之特點,並就目前新蘆線所發展之軌
道基座整體施工關鍵技術提出說明。
關鍵字:bottom up工法、top down 工法、基鈑承載面、修整
A Study of Track Plinth Characteristics in Taipei MRT Construction
1
Tao-Chia Wei Kuo-Hsiung Cheng 2
Abstract
The track plinth is constructed so as to provide support for rail fasteners to clamp down the
running rail. The aim of this article is to compare the construction characteristics of two construction
methods. The first one is "the steel mold formwork" which is utilized on the section of the Nangang
line east of Taipei Main Station; the other one is "GSF mold formwork" which is adopted on the
Tucheng line. The article also depicts the development of key technology for the monolithic plinth
construction on the Xin-Lu line.
Keywords: bottom up method, top down method, baseplate bearing surface, refurbishing
1
臺北市政府捷運工程局中區工程處副工程司 xu018199@trts.dorts.gov.tw
2
臺北市政府捷運工程局中區工程處 處長 khcheng@trts.dorts.gov.tw