150
ENGINEERING CORPORATION.
2017.
[2] Huang, M., Liao, M., & Zhuo, Y.
The 16th Cross-Straits Tunnels and
Underground Engineering Academic
and Technical Symposium -
Presentation on the Evaluation and
Consideration of the Selection of
Submerged Shield Machine for
Rapid Curve (R0M) Construction.
2017.
[3] P RI VATIZED 20 09 R S EA
ENGINEERING CORPORATION.
Backfill Grouting Construction
Plan for the CQ850 Section of the
Wanda Line. 2019.
[4] P RI VATIZED 20 09 R S EA
ENGINEERING CORPORATION.
Construction Plan of Submerged
Shield Tunnel through Shuanghe
Bridge Foundation Pile Breaking
for Wanda Line CQ850 Section
Bidding Project. Privatized 2009
Rsea Engineering Corporation.