Page 160 - 捷運技術 第59期
P. 160

150




                 ENGINEERING CORPORATION.
                 2017.

            [2]  Huang, M., Liao, M., & Zhuo, Y.
                 The 16th Cross-Straits Tunnels and

                 Underground Engineering Academic
                 and Technical Symposium -
                 Presentation on the Evaluation and

                 Consideration of the Selection of
                 Submerged Shield Machine for
                 Rapid Curve (R0M) Construction.

                 2017.
            [3]  P RI VATIZED 20 09 R S EA
                 ENGINEERING CORPORATION.

                 Backfill Grouting Construction
                 Plan for the CQ850 Section of the

                 Wanda Line. 2019.
            [4]  P RI VATIZED 20 09 R S EA
                 ENGINEERING CORPORATION.

                 Construction Plan of Submerged
                 Shield Tunnel through Shuanghe

                 Bridge Foundation Pile Breaking
                 for Wanda Line CQ850 Section
                 Bidding Project. Privatized 2009

                 Rsea Engineering Corporation.
                 2020.
   155   156   157   158   159   160   161   162   163   164   165