                 Introduction and Application of Automatic


              Monitoring System in Hsinchuang Depot of

                                        the Taipei MRT



            BINGYANG LIN , YUCHUN HUANG      2
                           1
            1  CECI Engineering Consultants INC.
            2  Geotech Science Co., Ltd
            Corresponding Author: YUCHUN HUANG, E-mail: Johnny@geotech-science.com



                                              ABSTRACT


            The Hsinchuang Line Taipei MRT's Hsinchuang Depot site is situated within the
            Hsinchuang fault zone, characterized by diverse geological compositions and
            materials, and notable decompression and swelling traits. These factors make it
            particularly susceptible to disturbances during slope excavation and construction.
            In order to address safety concerns for the adjacent Lesheng Reservation District
            and the slope, and based on expert recommendations, a cut-and-cover tunnel
            extending 200 meters eastward from the base's west side was implemented. This
            approach effectively mitigates the long-term decompression and displacement of
            the fault zone's geology, enhances slope stability through reduced height and
            structural overlap, and decreases the impact of groundwater pressure recovery and
            upward forces.
            During the slope excavation, ongoing monitoring and analysis of displacement
            were conducted using collected data. Additionally, given hydrological changes
            brought about by recent unexpected climate events, a response plan was developed
            to ensure long-term slope safety during operation. To further guarantee the safety of
            the Depot during the operational phase, as well as the safety of the nearby Lesheng
            Sanatorium, and to address external safety concerns about the Sanatorium, a
            comprehensive long-term safety monitoring system for the machine factory was
   143   144   145   146   147   148   149   150   151   152   153