Page 227 - 捷運技術 第35期
P. 227
捷運技術半年刊 第 35 期 95 年 8 月 219
臺北捷運機電工程的安裝、測試與整合
楊明強
摘 要
由於捷運機電系統之設備由不同的廠商提供,因此在設計階段就必須進行各種功能界面
及實體界面之協調整合作業,安裝完成以後,又必須進行各項動態測試、整合測試的作業,
將個別的子系統整合成為一個功能正常、運作穩定的捷運系統,然後才能交給捷運公司,承
擔起載客營運的任務,本文就捷運機電系統工程之安裝、測試及整合做一簡單的說明。
關鍵詞:系統整合、整合測試、界面協調
The Installation, Testing and Integration
of the Electrical and Mechanical Systems
in the Taipei MRT
Ming-Chiang Yang
Abstract
The equipment supplied to the Taipei Mass Rapid Transit System for its electrical and
mechanical systems comes from many different suppliers. Because of that, how the functions of the
various pieces of equipment interface and whether they are compatible need to be considered during
the design stage. Once installation is completed, a series of dynamic and integrating tests needs to
be performed to make sure that each subsystem will be part of a system that functions normally and
runs consistently across the network. This paper explains the installation, testing and integration of
the Taipei MRT electrical and mechanical systems.
Key Words:system integration, integration test, interface coordination
臺北市政府捷運工程局機電系統工程處 副工程司 10082@trts.dorts.gov.tw