                     捷運與共同管道共構工程施工技術



                                                          2
                                                                        3
                                   陳伯興   洪顯宗    黃金振   周立銘
                                            1
                                                                                     4

                                                      摘
                                                      摘摘        要要
                                                                要
                                                      摘     要
                 臺北市信義線共同管道因設置位置與臺北捷運信義線重疊,共同管道施工成為捷運與其
            他市政建設共構的重要課題之一。由於共同管道容納之管線種類眾多且特性各異,埋設深度
            與結構尺寸亦不相同,配合捷運設施之佈置以及各種管線需求所發展出之共同管道佈設方
            式、結構形式以及施工方式皆須於規劃設計時縝密考量,與捷運工程之施工界面及順序更需
            界定清楚。本文將介紹捷運與共同管道建設同步施工中將面臨的問題及克服方法。


            關鍵詞:共同管道、幹管、電纜溝、特殊部


                Construction Technology of Co-structures


                                   MRT and Common Duct



                                   1
                                                                                     3
                                                                                                         4
                                                              2
               Po-hsin Cheng  Hsien-chung Hung  Jing-jeng Huang  Li-ming Chou
                                                       Abstract


                 As the common duct along Xinyi Road is located in the same site as the Xinyi Metro line, the
            construction of the common duct has become one of the most important issues in the co-structuring
            of the Metro system and other city developments. A well-functioning common duct system can only
            be built with integrated planning considering the requirements of all the pipelines, careful
            engineering design in multiple disciplines and construction quality. The interfaces and procedures
            of the Metro and the common duct also have to be considered. The major problems and their
            solutions in co-construction of the Metro and common duct are introduced in this paper.


            Key words: common duct, trunk line common duct, cable trench, specified part











            1   臺北市政府捷運工程局南區工程處技正                    bschen@trts.dorts.gov.tw
            2   臺北市政府捷運工程局南區工程處第九工務所主任          sdhung@trts.dorts.gov.tw
            3   亞新工程顧問股份有限公司運輸與土木工程一部副總經理    jj.huang@maaconsultants.com
            4   亞新工程顧問股份有限公司運輸與土木工程一部計畫經理    lm.chou@maaconsultants.com
   40   41   42   43   44   45   46   47   48   49   50