圖 3-3-5 模式一:四條潛盾隧道開挖後地表面沉陷圖
0.00
-2.00
-4.00
-6.00
RD tunnel excavated
-8.00 RU tunnel excavated
OD tunnel excavated
OU tunnel excavated
-10.00
-50 -40 -30 -20 -10 0 10 20 30 40 50
測點與交叉段地表中心距離
圖 3-3-6 模式一:未地盤改良 A-A 剖面地表沉陷凹槽圖
圖 3-3-6 模式一:未地盤改良 A-A 剖面地表沉陷凹槽圖
FLAC3D 2.00 Job Title: Dk192 MRT Tunnels Crossing Analysis
Step 76817 Model Perspective View Title:
09:24:07 Mon Apr 22 2002
Center: Rotation:
X: 0.000e+000 X: 90.000
Y: 0.000e+000 Y: 0.000 34 35
Z: -2.265e+001 Z: 0.000
Dist: 3.505e+002 Mag.: 0.8
Ang.: 22.500
Contour of Z-Displacement
-6.0000e-002 to -5.7500e-002
-5.5000e-002 to -5.2500e-002
-5.0000e-002 to -4.7500e-002
-4.5000e-002 to -4.2500e-002
-4.0000e-002 to -3.7500e-002
-3.5000e-002 to -3.2500e-002
-3.0000e-002 to -2.7500e-002
-2.5000e-002 to -2.2500e-002
-2.0000e-002 to -1.7500e-002
-1.5000e-002 to -1.2500e-002
-1.0000e-002 to -7.5000e-003
-5.0000e-003 to -2.5000e-003
0.0000e+000 to 0.0000e+000
Interval = 2.5e-003
Surface
Null zones only
Itasca Consulting Group, Inc.
Minneapolis, MN USA
圖 3-3-7 模式二:四條潛盾隧道開挖後地表面沉陷圖
26