Page 110 - 捷運技術 第58期
P. 110
Journal of Rapid Transit System and Technology No.58
pp. 99-114, 2023 DOI 10.29670/JRTST.202310_(58).0004
Received May 1, 2021, accepted July 26, 2021, date of publication October 31, 2023
IV&V Risk Identification and Management_
Rail Vehicles
ANDY LIN , YOTEN HSU , BEN CHIANG 3
2
1
1 Ricardo Certification Limited Taiwan Branch
2 Ricardo Certification Limited Taiwan Branch
3 Ricardo Certification Limited Taiwan Branch
Corresponding Author: BEN CHIANG, E-mail: MingShan.Chiang@ricardo.com
ABSTRACT
The “Rules of MRT Final Inspection & Testing for Revenue Service” are the base
of the Independent Verification and Validation (IV&V) of each domestic metro
system. Among them, the “IV&V criteria” that should be proposed in the
verification and validation report is also the key factor for the effective and
efficient IV&V progress. This article explains the “risk-based” evaluation criteria
constructed by Ricardo Rail for IV&V evaluation work, which combines domestic
and foreign project experience and characteristics, and particularly emphasizes the
continuity of different stages in the entire life cycle, and proposes the key risks of
unmanned rapid transit vehicles, which can be used as a reference for future metro
and other rail-related projects to plan IV&V work scope and criteria.
Keywords: Final Inspection & Testing, Verification and Validation, Independent
Verification and Validation, Rail Vehicles, Risk