Page 110 - 捷運技術 第58期
P. 110

Journal of Rapid Transit System and Technology No.58
            pp. 99-114, 2023                                  DOI 10.29670/JRTST.202310_(58).0004




            Received May 1, 2021, accepted July 26, 2021, date of publication October 31, 2023




                 IV&V Risk Identification and Management_
                                       Rail Vehicles





            ANDY LIN , YOTEN HSU , BEN CHIANG     3
                                   2
                      1
            1  Ricardo Certification Limited Taiwan Branch
            2  Ricardo Certification Limited Taiwan Branch
            3  Ricardo Certification Limited Taiwan Branch
            Corresponding Author: BEN CHIANG, E-mail: MingShan.Chiang@ricardo.com



                                              ABSTRACT


            The “Rules of MRT Final Inspection & Testing for Revenue Service” are the base
            of the Independent Verification and Validation (IV&V) of each domestic metro
            system. Among them, the “IV&V criteria” that should be proposed in the
            verification and validation report is also the key factor for the effective and
            efficient IV&V progress. This article explains the “risk-based” evaluation criteria
            constructed by Ricardo Rail for IV&V evaluation work, which combines domestic
            and foreign project experience and characteristics, and particularly emphasizes the
            continuity of different stages in the entire life cycle, and proposes the key risks of
            unmanned rapid transit vehicles, which can be used as a reference for future metro
            and other rail-related projects to plan IV&V work scope and criteria.


            Keywords:  Final Inspection & Testing, Verification and Validation, Independent
                        Verification and Validation, Rail Vehicles, Risk
   105   106   107   108   109   110   111   112   113   114   115