Page 51 - 捷運技術 第54期
P. 51

捷運機電系統RAM配當方法



                                   RAM Allocation for MRT E&M System


                                                      Frank H.C. Chen *
                                              Mitsubishi Heavy Industries, Ltd.
                                     Shinkansen Nangang Extension Construction Office
                                  14F., No.112, Sec. 2, Zhongshan N. Rd., Taipei City 10449,
                                                      Taiwan (R.O.C.)
                                                      James C.W. Ngo
                                   Sumitomo Corporation Bangkok Red Line Project Office
                                                    Andrew W.Y. Chang
                                            Alstom Transport S.A. Taiwan Branch.
                                                         Yi-fan Kuo
                                        SRicardo Singapore PTE. Ltd. Taiwan Branch
                                                      Shuku C.C. Chu
                                     Toshiba Electronic Components Taiwan Corporation


                               (Date received:24 April 2018 ; revised:20 June 2018 ; accepted:27 August 2018)

                                                          Abstract

                                 RAM allocation is to analyze requirements relating to System Operation,
                               Maintenance, and to transfer those into Reliability/Availability/Maintainability
                               targets for System and Subsystem(s). The current RAM requirements are
                               unclear and not specific for the entire E&M System, and as such, this paper
                               is to introduce requirements from "Rules of Final Inspection & Testing
                               for Revenue Service and to allocate those down to subsystems through
                               appropriately weighted factors.
                               Keywords:  E&M System, Rules of Final Inspection & Testing for Revenue Service,
                                       System Assurance, Requirement Allocation, Weight Factor





















                           * Corresponding author : frank_chen@tsc-tokyo.gr.jp or u8036100@gmail.com




                                                             49
   46   47   48   49   50   51   52   53   54   55   56