Page 20 - 捷運技術 第54期
P. 20

捷運技術 第54期 民國108年10月
                           JOURNAL OF RAPID TRANSIT SYSTEMS AND TECHNOLOGY, NO.54, 2019


                                   BIM Design Implement of MRT Sungai
                                   Buloh-Serdang-Putrajaya Line in Kuala

                                                  Lumpur, Malaysia


                                                       Li-Ping Hung  *
                                 Department of Rapid Transit Engineering, CECI Engineering
                                                      Consultants, Inc.
                                  2F, No.323, Yangguang St., Neihu Dist., Taipei City 11491,
                                                      Taiwan (R.O.C.)
                                                     Cheng-Hsiung Liu
                                 Department of Rapid Transit Engineering, CECI Engineering
                                                      Consultants, Inc.
                                                         Jia-Jer Liu
                                 Department of Rapid Transit Engineering, CECI Engineering
                                                      Consultants, Inc.


                            (Date received:30 April 2019 ; revised received:27 June 2019 ; accepted:30 August 2019)
                                                          Abstract

                                 The proposed Klang Valley MRT Sungai Buloh-Serdang-Putrajaya Line
                               (SSP Line) is approximately 52.2km in length comprising the elevated works,
                               underground works and one deport of the Mass Rapid Transit (MRT) System.
                               The Underground Works (UGW) packages of the SSP Line is approximately
                               13.5km of twin bored tunnel with ten new underground stations, an existing
                               station, two crossover box structures, three intermediate ventilation shafts,
                               three escape shafts and one at grade cut & cover structure.
                                 The design & construction contract of SSP Line UGW awarded to MGKT
                               (MMC-GAMUDA) company and then AECOM company assigned as Lead
                               Design Consultant (LDC) to in charge of preliminary design, coordination and
                               integration work. Moreover, CECI company is invited as a Detailed Design
                               Consultant (DDC) and to do civil and structure detailed design works of
                               DDC7.
                                 DDC7 detailed design works packages are including the design of civil
                               works, temporary works and permanent works for the two new underground
                               stations, Chan Sow Lin Station and Conlay Station. DDC7 packages also
                               incorporate the structural enhancement works due to E&M opening of
                               existing Tun Razak Exchange Station and the supervision in chief works.
                               The experiences of BIM application into design and integration for MRT
                               underground station and the challenge and breakthrough during the design
                               phase for the two stations will be elaborated and introduced for further
                               reference.
                               Keywords:  MRT underground station, KVMRT SSP Line, BIM collaboration
                                       management, Design integration between different disciplines, BIM Level 2.