 連續壁、基樁與基礎組合成類似沉箱基礎型式,並以三向度等效彈簧模  Received May 31, 2023, accepted August 17, 2023, date of publication October 31, 2025
 擬土壤與結構互制。在不同的載重組合作用下,進行變形量及應力檢核,確

 保既有基礎及基樁安全無虞。          Taipei Twin Towers: A Case Study on
 臺北長廊,被定義為臺北城的歷史軸線,位於錯綜複雜的地下構造上。

 因此,部分鋼柱坐落於臺高鐵的隧道上方,為了克服難題,採用長跨轉換鋼  Special Considerations in Structural
 梁跨越隧道,其北側與既有地下室外牆相接,南側則座落在新建基樁,而不  Design for Integrating High-rise Buildings and
 與隧道直接接觸,此配置可將鋼柱的上部載重往兩端傳遞,確保隧道的安全。

 C1 / D1 聯合開發大樓是一個高度複雜和具有挑戰性的專案,需要團隊          Metro Stations
 成員之間不斷的溝通和協調,以擬定可靠的結構設計策略。通過創新且嚴謹
                 THOMAS KUO , POCHUN LIN , CHIAHUNG FANG , CHINGCHIEH LIN , DI JIANG ,
                                                                                              3
                                                                3
                                                                                   3
                               1
                                             2
 的結構設計,將新舊結構融為一體,確保整棟建築的安全。
                 CHUN CHEN , TAIPEI TWIN TOWERS      4
                             3
                 1  Evergreen Consulting Engineering, Inc., Chairman
 關鍵詞: 超高層建築結構、聯合開發、複合鋼板剪力牆、彈塑性分析、臺北  2  Evergreen Consulting Engineering, Inc., Project Manager
 長廊              3  Evergreen Consulting Engineering, Inc., Manager/Engineer
                 4  Taipei Twin Towers Limited
                                                   ABSTRACT


                 This project is a key part of the Taipei City Western District Gateway Project,
                 which includes two theme high-rise buildings, C1 and D1 tower. The Airport MRT
                 A1 station (i.e. Taipei Main Station) extends from basement level B3 to level 2,
                 where it is fully operational, and the two towers will be constructed on A1 station.
                 The investor, "Taipei Twin Towers Ltd.", commissioned the international architect
                 SOM to propose a new architectural scheme that would reconfigure the building's
                 massing, appearance, and spatial design while integrating it with the existing
                 structure, which also leads to numerous structural design challenges.
                 To achieve the overall architectural design philosophy, the building massing and
                 appearance were reformed via the application of structural dynamics and
                 aerodynamics, within an increment of heights forC1 and D1 towers to 280 and 360
                 meters, respectively. Meanwhile, to enhance the stiffness and strength of the core,
                 the D1 tower utilized Composite Plate Shear Walls - Concrete Filled (C-PSW/CF)
                 instead of conventionally Special Concentrically Braced Frames (SCBF). This
                 innovative system is combined with outrigger trusses to rigidly connect the core
   60   61   62   63   64   65   66   67   68   69   70