Page 178 - 捷運技術 第59期
P. 178

168




            REFERENCE                                  [6]  Kawashima, H., Komura, F.,
                                                            Honma, K., Iwasaki, A., Takaoka,

            [1]  CAREC,Track Capacity and                   T., Tashiro, K., & Monma, N., A
                 Timetable Software. Central Asia           Total Railway System Simulator

                 Regional Economic Cooperation.             an d its  A p p licatio n to th e
                 2020.                                      Evaluation of Energy-Saving Train
            [2]  Hirano, J., Tomii, N., Yamashita,          Operation. Computers in Railways

                 O., & Kimura, Y., Development of           III, 1, pages 85-95. 1992.
                 a Train Performance Computation       [7]  Kunimatsu, T., Terasawa , T., &

                 System on an Engineering                   Takeuchi, Y., Evaluation of Train
                 Workstation. Computers in                  Operation with Prediction Control
                 Railways III, 1, pages 127-136.            by Simulation. 8Th International

                 1992.                                      Conference on Railway Operations
            [3]  Huang, Y., Tan, L., Chen, L., &            Modelling and  Analysis –
                 Tang, T.,A Neural Network Driving          RailNorrkoping 2019, pages 589-

                 Curve Generation Method for the            606. 2019.
                 Heavy-Haul Train. Advances in         [8]  Lee, C. K., & Sun, C. H.,A
                 Mechanical Engineering, 8(5),              Simulation Study on Energy Saving

                 pages 1-14. 2016.                          Effect of  Train Operation.
            [4]  Jong, J. C., & Chang, S., Algorithms       Transportation Planning Journal,

                 for Generating Train Speed Profiles.       30(1), pages 237-252. 2001.
                 Journal of the Eastern Asia Society   [9]  Mic hl , Z., & Marti n, S.,
                 of Transportation Studies, 6, pages        Microsimulation  as a Tool for

                 356-371. 2005.                             Evaluation of Infrastructure and
            [5]  Jun, H. Y., Lee, D. H., & Yang, D.         Operational Concept Alternatives

                 C., Development of a Simulator             in a Complex Railway Node.
                 Based on  Train Performance                Logistyka 4/2014, pages 3029-
                 Simulation. Computer-Aided                 3037. 2014.

                 Design and Applications, 3(1–4),      [10] Murakami, K., Haga, I., Nakamura,
                 pages 465-473. 2006.                       H., Maehashi, S., & Yamashida, O.,
   173   174   175   176   177   178   179   180   181   182   183