                 [12] Taiwan Electric Power Co., Ltd.           CITY GOVERNMENT. Circular
                      IEC 61850 Specification for               Line (2nd phase) CF620 CF620/

                      Substation/Switchyard Equipment.          CF627/CF621 E&M System,
                      2019.                                     Automatic Fare Collection System

                 [13] Po-I  Yeh.   AN  OFF-LINE                 and Trackwork special technical
                      ANALYSIS FOR ENHANCING                    specification. 2020.
                      THE RELIABILITY OF THE               [17] DEPARTMENT OF RAPID

                      POWER REMOTE CONTROL                      TRANSIT  SYSTEMS TAIPEI
                      SYSTEM OF TAIPEI MRT Thesis               CITY GOVERNMENT. Wanda
                      for Master of Science. Department         Zhonghe Shulin Line (Phase 1)CQ810/

                      of Electrical Engineering Tatung          CQ817/CQ811 of the Procurement
                      University. 2012.                         Case of Electromechanical System,
                 [14] DEPARTMENT OF RAPID                       Automatic Toll Collection System

                      TRANSIT  SYSTEMS TAIPEI                   and Track Engineering POWER
                      CITY GOVERNMENT.  Metro                   RTU System Rev. B. 2022.

                      Engineering Series Electromechanical   [18] DEPARTMENT OF RAPID
                      Series Volume 25 Practice of              TRANSIT SYSTEMS TAIPEI CITY
                      Communication Systems on the              GOVERNMENT. Wanda Zhonghe

                      Taipei MRT. 2021.                         Shulin Line (Phase 1) CQ810/CQ817/
                 [15] DEPARTMENT OF RAPID                       CQ811 of the COM Subsystem

                      TRANSIT  SYSTEMS TAIPEI                   Communication Optical Fiber
                      CITY GOVERNMENT. Wanda                    Transmission Sysrem Conceptual
                      Zhonghe Shulin Line (Phase 1)             Design Rev. 0. 2020.

                      CQ810/CQ817/CQ811 E&M
                      System, Automatic Fare Collection
                      System and Trackwork special

                      technical specification. 2016.
                 [16] DEPARTMENT OF RAPID
                      TRANSIT  SYSTEMS TAIPEI