                 建築資訊模型(Building Information Modeling,簡稱BIM)是透過建立含有豐富資訊的建
            築物3D模型,「完整」呈現建築物結構系統、建築空間配置、機電管線安排等設計細節,
            並透過模型與設計需求的相關資訊連結,直接由BIM模型中產出設計資訊,以大幅減少各設

            計介面衝突,使工程成本有效降低,並提升設計作業效率。本文以臺北捷運環狀線Y19高架
            車站為應用案例,將BIM技術導入該車站細部設計流程中,應用成果顯示BIM設計流程可有
            效提升設計團隊專業介面間之整合效率,減少變更設計機率,進而提升整體設計品質。
            關鍵詞:BIM、細部設計、工程介面、設計整合


                          The Application of BIM to Elevated Stations


                —A Case Study of Taipei MRT Circular Line Station Y19



                                                                     3
                               1
                                                 2
                                                                                          4
                 S.M. KANG  N.D. YANG  S.T. CHIANG  S.M. ZHANG  Y.H.LIN                                 5
                                                       Abstract
                 Building Information Modeling (BIM) provides an integrated engineering platform of structural
            system, architectural layout, and Mechanical, Electrical, Plumbing (MEP) arrangement for MRT
            design team. BIM was applied to the detailed design work of Circular line Station Y19 that resulted
            in a decrease of design interface differences and an improvement in project budget control through
            the interface integration of BIM models linked with the engineering information. Meanwhile,

            design drawings and quantity sheets can be produced directly from BIM models, increasing design
            efficiency and enhancing overall design quality.
            Keywords:  Building Information Modeling (BIM), detailed design, engineering interface,
                        design integration










            1   亞新工程顧問股份有限公司BIM管理及工程整合中心經理                            sm.kang@maaconsultants.com
            2   亞新工程顧問股份有限公司BIM管理及工程整合中心結構組長  zarlent.yang@maaconsultants.com
            3   亞新工程顧問股份有限公司BIM管理及工程整合中心建築組長  shuotao.chiang@maaconsultants.com
            4   亞新工程顧問股份有限公司BIM管理及工程整合中心機電組長  sihming.zhang@maaconsultants.com
            5   台北市政府捷運工程局工程員                                         yhlin@trts.dorts.gov.tw