146        孫吉甯 常輝庭 捷運跨河隧道及道岔工程施工-以臺北捷運CK570C標工程為例





                            Construction of River-Crossing Tunnels and Turnout Work

                       for Taipei MRT - Taking Contract CK570C of the Xinzhuang

                                                      Line as an Example
                                                                   1
                                                   Sun Chi-ning   Chang Huei-ting        2
                                                                 Abstract

                           This article describes the construction of river-crossing tunnels and the turnout section
                       of the Xinzhuang line Section Contract CK570C, a crucial section of the Taipei MRT “Three

                       Rings & Three Lines.” As the section is a crucial point where the Xinzhuang and Luzhou
                       lines enter New Taipei City's Sanchong, Xinzhuang, and Luzhou districts, a deep excavation
                       is needed at the cut-and-cover tunnel's turnout section beneath the Danshui River which
                       separates Taipei City and New Taipei City. A cofferdam was built in the river to provide
                       working space for open-cut excavation, construction machines and tools. The turnout, the

                       branch line fork of the Xinzhuang line and Luzhou line, is 125m long, 41.5m deep and
                       gradually changes from 15m to 26m in width, of which 40m of the length is located beneath
                       Huanhe N. Rd. inside the levee bank while the other 85m runs in the area beyond the levee.

                       The section is a four-level underground structure with a 41.5-m-deep excavation. Some
                       special construction methods, such as bottom sealing grouting, a 2-m-thick diaphragm
                       wall, and large-scale dewatering, were applied to this work to overcome underground earth
                       pressure, water pressure and upwelling force.



                           Sand upwelling and water upwelling were typical problems during the tunnel entrance
                       frame excavation, especially in deep areas with high earth and water pressure. Due to the
                       uncertainty of the grouting effect, these problems could cause serious damage to the entrance

                       frame and result in construction failure. There were a total of eight tunnel entrance frames
                                                                                                  2
                       at depths ranging from 32.5m to 23m and water pressures from 23 to 32 t/m . The freezing
                       method with high pressure jet grouting was applied to assure the effect of the water seal
                       during the tunnel entrance frame excavation. The high difficulty and risky construction made


                       Section Contract CK570C the first of its type in the nation. The successful experience is truly
                       beneficial to the enhancement of technology in domestic construction.


                       Keywords: turnout, cofferdam, JSP piles, diaphragm walls, bottom sealing grouting, large-
                                   scale dewatering, shield tunneling method, high pressure grouting, freezing
                                   method




















                                                                                                                 2011/10/21   下午 06:16:46
          D1-(捷運跨河隧道及道岔工程施工)_.indd   146                                                                         2011/10/21   下午 06:16:46
          D1-(捷運跨河隧道及道岔工程施工)_.indd   146
   147   148   149   150   151   152   153   154   155   156   157