捷運技術半年刊 第45期                                            261




                                   臺北國際花卉博覽會圓山公園區


                                            搶修工作回顧與展望
                                              1
                                                                                         5
                                黃荻昌編撰   郭應熙   高麗娟   沈文修   張文政

                                                         2
                                                                   3
                                                                              4
                                                        摘 要

                     本文乃以臺北市政府捷運工程局編撰的「2010臺北國際花卉博覽會應變中心」的
                「搶修工作成果報告書」為素材,全文旨就花博應變中心之緣起、整備、執行要領、
                重大事蹟、成果績效與興革建議作一回顧與展望。首先對花博應變中心的定位與組
                織、99年10月8日前後的整備,以及99年10月9日起之執行型態與成果三子題概述,繼
                之撰述值得檢討之九項重大事蹟、大事紀要類型,最後提出成效檢討,包括作業模式
                創新概念、同心協力標竿故事、三項優點與其精進,以及七項自我性策進作為及八項
                整體性興革建議。


                關鍵詞:花博應變中心、整備、重大事蹟、成效檢討、興革建議

                Review and Perstective of Salvage Tasks Performed at Yuanshan

                Park Area During the 2010 Taipei International Flora Exposition
                                                                          2
                                                       1
                           David Ti-Chang Hwang   Ying-Hsi Kuo   Li-Chuan Kao                3
                                                         4
                                  Wen-Shiou Shen   Wen-Cheng Chang                    5
                                                       Abstract

                    The content of this article is based on the Salvage Task Result Report prepared by
                DORTS for the 2010 Taipei International Flora Exposition's Response Center. The authors
                aim to give a review and the outlook of the 2010 Taipei International Flora Exposition's
                Response Center, including the origin, preparation work, keys for implementation, major

                events, achievements, and suggestions. In this article, a general description of the position
                and organization of the Response Center, preparation work before October 8, 2010, and
                implementation and achievements during the period from October 9, 2010 are covered

                under three subtitles followed by a summary of nine major events and an efficiency review
                including creative concepts of work patterns, stories about exemplary performances, three
                advantages and their related enhancements, seven self-improvements, and eight overall
                suggestions.

                Keywords: Response Center, preparatory work, major event, review, suggestions


               1  臺北市政府捷運工程局總工程司室正工程司                            davidhwa@trts.dorts.gov.tw
              2   臺北市政府捷運工程局工務管理處副工程司                            11108@trts.dorts.gov.tw
              3   臺北市政府捷運工程局聯合開發處工程員                             41220@trts.dorts.gov.tw
              4  臺北市政府捷運工程局工務管理處技正                               wsshen@trts.dorts.gov.tw
              5   臺北市政府捷運工程局南區工程處水電環控科副工程司  17145@trts.dorts.gov.tw
   264   265   266   267   268   269   270   271   272   273   274