                         蘆洲線特殊軌組裝前置作業施工程序之演進
                                                        ᕧ༸Գ
                                                        摘 要
                 ၽ̏ઠ༶ᘻݲᇞЗήɨݬೌ༸❊༸ґतࣿࠐ༸ਜમ͜ʘࠐґۨόၾՉ̴ʊᐄ༶ʘ༩ݬ
            મ͜Νʘ૿ኑɺوdΪՉછՓ፻ࠐϔτༀЗໄ̻ٙࠅӋ৷d˲ცࡒՈ݄Ъکлe
            Զஷ༩ၾᆽڭЪุۜሯᖢ֛ഃतd݂ί૿ኑɺو݄ጘҁϓܝdІ፻ࠐϔʘᒞ֛ࢁ၍ಔɝ
            ʿו༱ࠦႡЪഃචݬʘЪุҏձۜሯd੬ᅂᚤतࣿࠐଡ଼ༀۜሯၾᖢ֛dᒱϤɓචݬЪ
            ุ᙮ᐑືʕɓʱdઓ੬ҲစӔ֛ٙԉЍf
                 ͉˖ɗఱ݄ʈᅀਠྌ૿ኑɺو݄ጘҁϓܝЇतࣿࠐଡ଼ༀۃʘ፻ࠐϔʘᒞ֛ࢁ၍ಔɝ
            Їו༱ࠦႡЪཀʕʘЪุනҏሜʿЪุʱʈᐏߧʘࣖूၾۃБᅺਂجˢ༰ႭdԶܝᚃ
            ݄ʈᅀਠੂБਞϽf
            ᗫᒟ൚jतࣿࠐeಔɝe෦ᆉ
                Evolution of Pre-operation of Taipei MRT Luzhou Line’s DFF Non-ballast
                                          Special Trackwork Installation
                                                    Tao-Chia Wei
                                                       Abstract
                  Taipei MRT Luzhou line’s direct fixation fastener (DFF) non-ballast special trackwork rests
             on the same type of slab as those adopted for MRT lines currently in service. Installation of the
             fasteners plays a key role in the construction of successful special trackwork, in particular, the
             evenness of the fastener position is a strict requirement. However, DFF features easy operation,
             allows space of passage during construction as well as assured quality. In the pre-operation of
             Luzhou line’s non-ballast special trackwork, after the track slab is cast in-situ, the quality of DFF
             non-ballast special trackwork will depend on the procedures to build-in the anchor male cone and
             the quality of the bearing surface in this crucial step in the installation stage, even though these
             activities constitute only a part of the overall assembly work.
                  This paper addresses the work sequence and details of these two major activities, i.e. fastener
             insert implanting and base-plate bearing surface finishing, which are implemented in the Taipei
             MRT Luzhou line. Also, associated benefits compared with corresponding activities applied in
             previous MRT construction are discussed, intending to provide a reference for future Taipei MRT
             construction.
             Keywords: special trackwork, implant, mortar patching