Page 161 - 捷運技術 第41期
P. 161

捷運技術半年刊 第41 期                                            155





                         蘆洲線特殊軌組裝前置作業施工程序之演進




                                                        ᕧ༸Գ


                                                        摘 要

                 ၽ̏ઠ༶ᘻݲᇞЗ׵ήɨݬೌ༸❊༸ґतࣿࠐ༸ਜમ͜ʘࠐґۨόၾՉ̴ʊᐄ༶ʘ༩ݬ
            મ͜޴Νʘ૿ኑɺوdΪՉછՓ፻ࠐϔ΁τༀЗໄ̻ٙ዆׌ࠅӋ৷d˲ცࡒՈ݄Ъکлe౤
            Զஷ༩ၾᆽڭЪุۜሯᖢ֛ഃत׌d݂ί૿ኑɺو݄ጘҁϓܝdІ፻ࠐϔ΁ʘᒞ֛ࢁ၍ಔɝ
            ʿו༱ࠦႡЪഃචݬʘЪุ೻ҏձۜሯd੬ᅂᚤतࣿࠐଡ଼ༀ዆᜗ۜሯၾᖢ֛dᒱϤɓචݬЪ

            ุ᙮ᐑືʕɓ௅ʱdઓ੬ҲစӔ֛׌ٙԉЍf
                 ͉˖ɗఱ݄ʈᅀਠ஝ྌ૿ኑɺو݄ጘҁϓܝЇतࣿࠐଡ଼ༀۃʘ፻ࠐϔ΁ʘᒞ֛ࢁ၍ಔɝ
            Їו༱ࠦႡЪཀ೻ʕʘЪุනҏሜ዆ʿЪุʱʈᐏߧʘࣖूၾۃБᅺਂجˢ༰Ⴍ׼dԶܝᚃ
            ݄ʈᅀਠੂБਞϽf

            ᗫᒟ൚jतࣿࠐeಔɝe෦ᆉ




                Evolution of Pre-operation of Taipei MRT Luzhou Line’s DFF Non-ballast
                                          Special Trackwork Installation


                                                    Tao-Chia Wei
                                                       Abstract


                  Taipei MRT Luzhou line’s direct fixation fastener (DFF) non-ballast special trackwork rests
             on the same type of slab as those adopted for MRT lines currently in service. Installation of the
             fasteners plays a key role in the construction of successful special trackwork, in particular, the
             evenness of the fastener position is a strict requirement. However, DFF features easy operation,
             allows space of passage during construction as well as assured quality. In the pre-operation of
             Luzhou line’s non-ballast special trackwork, after the track slab is cast in-situ, the quality of DFF
             non-ballast special trackwork will depend on the procedures to build-in the anchor male cone and
             the quality of the bearing surface in this crucial step in the installation stage, even though these

             activities constitute only a part of the overall assembly work.
                  This paper addresses the work sequence and details of these two major activities, i.e. fastener
             insert implanting and base-plate bearing surface finishing, which are implemented in the Taipei
             MRT Luzhou line. Also, associated benefits compared with corresponding activities applied in
             previous MRT construction are discussed, intending to provide a reference for future Taipei MRT
             construction.
             Keywords: special trackwork, implant, mortar patching



            ତ΂jʹஷ௅৷஺᚛༩ʈ೻͍҅ʈ೻̡ccccccccccccccctcwei@nthsrl.hsr.gov.tw
            ࡡ΂jၽִ̹̏݁ઠ༶ʈ೻҅ʕਜʈ೻ஈਓʈ೻̡
   156   157   158   159   160   161   162   163   164   165   166