Page 70 - 捷運技術 第56期
P. 70
Journal of Rapid Transit System and Technology No.56
pp. 59-76, 2021 DOI 10.29670/JRTST.202110_(56).0004
Received June 11, 2021, accepted September 07, 2021, date of publication October 31, 2021
Traffic Maintenance Planning for the
Circular Line South Sections and North Sections
(Utilize VISSIM To Improve Traffic Maintenance
Planning)
CHENYUN YEN , MINGYING JIANG , YITING LEE
2
1
1
1 CECI Engineering Consultants, Inc., Taiwan
2 ATCI Engineering Consultants, Inc., Taiwan
Corresponding authors: CHENYUN YEN, E-mail: cyyen@ceci.com.tw
ABSTRACT
Traffic Maintenance Planning is utilized for the Circular Line South Sections
(DF115) and North Sections (DF116、DF117) of Taipei MRT which are located on
the south side of the central part of the Taipei City (Muzha area) and the Xindian,
Wugu,Sanchong, and Luzhou districts of New Taipei City. Projects include
stations, cross-over and Ventilation shafts with the cut and cover method, and
shield tunnels with shield machines. The main item of impact is station excavation.
This paper presents the traffic maintenance planning for the Circular Line South
Sections (DF115) and North Sections (DF116、DF117) of Taipei Metropolitan
Area Rapid Transit Systems Project. A special section dedicated to traffic
maintenance planning and supporting measures is included as well as the use of
VISSIM for improvements. Through proper design considerations, construction
sequence planning and traffic maintenance plans, the impacts on roads can be
minimized. This article will also present traffic maintenance planning for detailed
special road sections of each standard and simulation results.
Keywords: Traffic Maintenance Plan, Traffic Impact Assessment