Page 127 - 捷運技術 第55期
P. 127

臺北盆地邊緣潛盾隧道遭遇複合地層之設計考量與施工規劃 | 陳建仁等


                   O.C.): BES Engineering Co., 2018.         East Extension of the Taipei MRT
               [3]   BES Engineering Co. and DAIHO           Xinyi Line - CR285 Bored Tunnel
                   Corporation, Taiwan  Branch,              Project. Taipei City, Taiwan(R.
                   Tunneling Plan for the CR285              O.C.): BES Engineering Co., 2019.
                   Bored Tunnel Project, East            [8]   BES Engineering Co. and DAIHO
                   Extension of the Taipei Rapid             Corporation, Taiwan  Branch,
                   Transit Line, Section CR580C Bid          Building protection and on-board
                   Project. Taipei City, Taiwan(R.           grouting construction plan for the
                   O.C.): BES Engineering Co., 2018.         bored tunnel project CR285, bid
               [4]   BES Engineering Co. and DAIHO           section CR580C, East Extension
                   Corporation, Taiwan  Branch,              of the Taipei Rapid Transit Line,
                   Construction Plan for the East            BES Engineering Co. Taipei City,
                   Extension of the Taipei MRT Xinyi         Taiwan(R.O.C.): BES Engineering
                   Line Section Bidding Project              Co., 2020.
                   CR580C - Shield Tunnel Departure      [9]   BES Engineering Co. and DAIHO
                   and Arrival and Geotechnical              Corporation, Taiwan  Branch,
                   Interface Improvement Project.            CR580C, East Extension of Taipei
                   Taipei City, Taiwan(R.O.C.): BES          Rapid Transit Line - Bored Tunnel
                   Engineering Co., 2018.                    Construction Plan for CR285.
               [5]   BoHsing Chen, ChunChang Liao,           Taipei City, Taiwan(R.O.C.): BES
                   and ShunTa Chiu, “Construction            Engineering Co.
                   completion of the shield tunnel
                   for the earth-rock interface section
                   of the Xinyi Line r05(Xiangshan
                   Station) to r04(last track section)
                   - engineering practice and
                   construction response for earth-
                   rock iinterface,” Rapid Transit
                   Systems and Technology, no. 43,
                   pp. 131-154, Feb. 2010.
               [6]   DingYen Wu, YiChao  Huang,
                   and ChungJen Chou, “Special
                   considerations and construction
                   methods of mrt Xinyi Line dr148
                   design bid civil engineering
                   design,” Rapid Transit Systems
                   and Technology, no. 51, pp. 17-40,
                   Aug. 2016.
               [7]   BES Engineering Co. and DAIHO
                   Corporation, Taiwan  Branch,
                   Building Protection Construction
                   Plan for the CR580C Section of the



               119                 JOURNAL OF RAPID TRANSIT SYSTEMS AND TECHNOLOGY, NO.55, 2020
   122   123   124   125   126   127   128   129   130   131   132