捷運技術 第51期 95
捷運信義線土建施工-CR580B區段標之特殊施工及障礙處理
吳甹倫 1
摘要
捷運信義線CR580B區段標整體施工範圍西起信義路4段與安和路口,向東沿信義路4、5
段,止於信義路6段33/46號前,包括R07信義安和站、R06台北101/世貿站及R05象山站(含
主變電站及尾軌工作井,其中尾軌工作井係未來信義線東延段R04站之一部分)等3座地下
車站、3.238公里長之隧道,本文就本區段標施工期間所使用之4種特殊工項及2項障礙處理
做一說明。
關鍵詞:纖維鋼筋、土岩界面、管幕工法、結晶化玻璃牆面、地下障礙
Taipei MRT Xinyi Line Civil Works Construction, Section Contract
CR580B: Special Construction and Overcoming Obstacles
Pin-luen Wu 1
Abstract
The work scope of the MRT Xinyi line Section Contract CR580B extended from the
intersection of Xinyi Rd. Sec. 4 and Anhe Rd. to the west to Xinyi Rd. sections 4 and 5 to the east.
It ended in front of No. 33/46, Sec. 6, Xinyi Rd. The project included three underground stations:
Xinyi Anhe (R07), Taipei 101/World Trade Center (R06) and Xiangshan (R05) (involving a bulk
supply substation and a tail-track work shaft which is a part of the future Xinyi Eastern Extension
Station R04) along with a 3.238-kilometer-long tunnel. This article introduces four special work
items and treatment of two obstacles that arose during construction.
Keywords: FRP, soil and rock interface, pipe roofing method, crystallized-glass wall,
underground obstacles
1 臺北市政府捷運工程局南區工程處幫工程司 plwu @ trts.dorts.gov.tw