Page 7 - 捷運技術 第42期
P. 7

RAPID TRANSIT SYSTEMS & TECHNOLOGY


                                         Taipei MRT Extends in All Directions
                       —Special Report on the Taipei MRT Xinzhuang Line Taipei City Section





                     連通臺北城的隧道工藝                                   臺北城捷運化的管理與機電經驗
              Technology-Based MRT Tunnels Connecting Taipei City  Experience in Management and E&M Systems Implementation During
                                                                           MRT Construction in Taipei City
                    由巴塞隆納地鐵建設對臺北捷運之省思與期許
             B1
                       鄭國雄、陳俊宏                                        29     新型自動靠站停車系統─以新莊線及蘆洲線為例
                                                                C1
                   What can Taipei MRT learn from the Barcelona subway              陳武璋、林裕德                                      155
                   experience                                         Newly Enhanced Programmed Station Stop System on the
                                                                      Xinzhuang & Luzhou Lines
                    新莊蘆洲線土建工程的各種工法與施工過程概述
             B2
                       工管處、北工處、中工處、南工處                41        C2     新蘆線專案工程管理與系統整合執行的經驗分享
                   Construction Methods and Processes of the Xinzhuang &              簡志明、梁瑄、黃奇元、鄭金善楨
                   Luzhou Lines’Civil Engineering              163
                                                                      Project Management and System Integration of the
                    麻花隧道的成功故事-潛盾隧道近接交會施工探討                            Xinzhuang & Luzhou Lines
             B3
                       陳建宏、崔澎生、鄭世一                            69
                   A Multiple Tunnel Crossing Construction Success Story       新蘆線國際軌道標監造簽證顧問核心技術及經驗
                                                                C3
                                                                          分享


                     潛盾隧道掘進管理與線形修正要領                                      張 思、顏啟仁                                      169
             B4
                       張武訓、詹榮鋒、林國濬、林福春                85              The Core Technology of Trackwork Certification
                   Shield Tunnel Excavation Management and Alignment   Consultant Project for the Xinzhuang & Luzhou Lines
                   Correction
                                                                      臺北捷運工程新莊線市區段工務管理之應用與精
                   新莊線(市區段)潛盾隧道穿越臺、高鐵隧道既有                       C4    進作為
             B5    結構下方之成功案例                                              張武訓、林宗銘、洪顯宗、傅信義、謝爾貴 175
                       詹榮鋒、程道信                                        99  Application and Enhancement of Construction Management
                   Case Study of Tunneling Through a Retaining Wall   of the Xinzhuang Line Taipei City Section
                   Beneath an Existing Subway System for the Xinzhuang
                   Line Taipei City Section                            新莊蘆洲線工程的文件與管理
                                                                C5
                                                                          楊玄百、高文煌                                      187
                   新莊線(市區段)潛盾隧道環片灌漿孔封圈環塞止
             B6    水裝置之實務探討-以CK570A標為例                                Xinzhuang & Luzhou Lines Project Document Management
                       張武訓、莊建忠、黃志棟、王志欽              115
                   Practical Grout Plug Sealing Devices for Shield Tunnel   建設臺北城的真實故事
                   Lining Segments at Xinzhuang Line Taipei City Section—
                   Taking CK570A Project as an Example                True Stories of MRT Construction in Taipei City

                     信義線R05(象山站)~R04(尾軌段)土、岩界面段潛
             B7    盾隧道掘進施工完成說明-土岩界面之工程實務                        D1     新莊線市區段建設憶事──土建施工故事
                   與施工應變                                                  南區工程處                                            197
                       陳伯興、廖純璋、邱順達                          131       Recollections of the Construction of the Xinzhuang Line
                   Shield Tunnel Construction in the Complex Stratum for   Taipei City Section--Stories of Civil Engineering
                   Taipei MRT Xinyi Line between Elephant Mountain
                   Station (R05) and Tail Track Section (R04) -  D2     新莊線市區段建設憶事──機電施工故事
                   Construction Practice and Contingency in the Complex              機電系統工程處                                      213
                   Stratum                                            Recollections of the Construction of the Xinzhuang Line
                                                                      Taipei City Section --Stories of E&M Systems
                                                                       機電施工影像之旅
                                                                D3
                                                                          機電系統工程處提供照片、侯世傑編撰        221
                                                                      Photo Gallery of E&M Systems Construction

                                                               徵稿須知
                                                               Reminder for contributing articles







        Б˂ࢗ१̏၌ɪБᇞᆑ޷ᎆ༸cᙲᅂjੵࡌ၂€ɺܔஈ
   2   3   4   5   6   7   8   9   10   11   12