捷運技術半年刊 第41 期 195
臺北捷運高運量系統行控中心之精進
1
؛ᆧ
摘 要
ၽ̏ઠ༶৷༶ඎӻ୕ʘБછʕːڷ͏86ϋ3˜28˚͍όᐄ༶ЇʦdΪɿӻ୕ʿ༟ৃ
ʈุɽష೯࢝dண௪Ӗᔚ౬อ̋d߰ʍண௪ޫࠦᑗࡡᅀ৾ପe௪ۜ՟ʔdϾცࠠໄא
һอd˸ၪܵઠ༶ዚཥӻ୕ʘ̙ቦܓdᆽڭೌʕᓙʘᐄ༶ۜሯf
ͦۃၽ̏ઠ༶৷༶ඎӊ˚൴ཀɓϵຬɛϣࣚ܄dνОίࡡѧආБࠠໄʈdϾʔᅂ
ᚤᐄ༶ۜሯeᆽڭೌОᐄ༶ʕᓙd݊ࠅϽඎٙʈЪࠅᓃf
͉˖ߠ౻˴ᕚމ৷༶ඎႦБછʕːཥ໘ࠠໄʈ(ᅺIUY008)dՉʈЪࠅᓃމj
gࡡѧࠠໄdʔᅂᚤᐄ༶dᆽڭਕۜሯf
gΌࠦһอɿӻ୕છՓ̨dԶബቇʘɛΪʈணࠇdʿБછʕːߕᝈf
gԶ̌ঐ੶ɽʿΥٙܝҳᅂӻ୕f
gԶһɛʷٙPC BasedႦཥ໘ɛዚЪʧࠦf
ᗫᒟ൚ : Іਗΐԓ္છeܝҳᅂᜑͪኜeɛΪʈணࠇeછՓ̨eႦண௪גe
ۃ၌ஈଣ ኜ
Enhancement of Taipei MRT System Operation Control Center
Chen Wu-Chang
Abstract
The Operation Control Center of the Taipei MRT system began operation on March 28,
1997. Due to the speedy upgrade of subsystems and the information industry, much of the original
equipment is no longer being made by the original manufacturers and obtaining spare parts can
be very difficult. Therefore, replacement or renewal is necessary to maintain the reliability of the
MRT’s E&M system so as to ensure uninterrupted operation quality.
Currently, Taipei MRT’s system carries over one million passenger trips per day. Carrying out
renewal work at the “original location” without affecting operation quality is a critical issue for
consideration.
The theme of this article is the MRT system Operation Control Center Signaling Computer
Replacement Project. The work scope includes:
. Carrying out the replacement at the original location without affecting operation to ensure
service quality
. Performing a comprehensive update of all subsystem consoles so as to provide a
comfortable ergonomically designed operation control center
.Providing a rear projector system with powerful and integrated functionality
.Providing a more human operation interface for the PC-based signaling computers
Keywords: automatic train supervision, rear projection display, ergonomic design, control panel,
signal equipment room, front-end processor
1c ၽִ̹̏݁ઠ༶ʈ҅ዚཥӻ୕ʈஈʈਕה˴ccccccthwu@trts.dorts.gov.tw