Page 3 - 捷運技術 第38期
P. 3
Technology of MRT Construction
Contents
Preface
Diversified and Carefully-Chosen Construction Methods and Their Application
The Application of Freezing Method on the Ground Treatment of Shield Tunnel Section Beneath
Danshui River ...................................................................................................................................... 1
Freezing Method Applied on the Tunnel-Breakthrough Construction of Taipei MRT Xinzhuang
Line's Contract CK570G ................................................................................................................... 14
A Discussion of Bored Tunneling Driving Through a Retaining Wall Beneath an Existing Railway
System ................................................................................................................................................. 24
Case Study of the Dewatering Methods for the Deep Excavation of Turnout Structure of CK570C of
the Taipei MRT ................................................................................................................................... 37
Taiwan Taoyuan International Airport Access MRT System A1 Station and C1/D1 Relevant
Development Building Pile Foundation Preliminary Loading Test Content and Application ............ 48
Special Treatment for Removing Obstructions in the Pipe Jacking Construction-Pull Back Method ........ 59
The Geotechnical Settlement Control at Lochou Depot ..................................................................... 74
State-of-the-Art Construction Methods Applied to Cross Passages
Introduction of Anchor Caisson Method as Adopted on Contract CL700A ....................................... 86
The Construction of the Long Distance Cross Passage in the Taipei MRT Xinzhuang Line CK570B
Project ................................................................................................................................................. 99
The Construction of MRT Cross Passage beneath the Apron in Operating Song-Shan Aerodrome - A
Case Study of Contract CB420, Neihu Line TRTS .......................................................................... 114
Viaduct Construction Methods Applied in Areas With Heavy Traffic
Construction of Precast Segmental Cantilever Bridges at the Metropolitan Area of Heavy Traffic–
Taking the Neihu MRT Line's Construction for Example ................................................................ 127
The Construction of Steel Bridge over the National Freeway .......................................................... 139
Human-Concerned Stories and Construction Methods
The Removal Project of Taipei Workshop of the Department of Railways, Taiwan Governor-General
Hall .................................................................................................................................................... 152
Study on and Evolution of the Fourth-Generation Decking System for the Taipei MRT Xinyi Line ....
160
Introduction of Urban Environmental Construction Method - Silent Piling Method ....................... 173
Adoption of Diamond Chain Cutting Method for Demolishment of Existing Diaphragm Wall ............... 188
Moving Toward Higher Value With DOT Construction
The First Application of Double-O-Tube (DOT) Shield Tunneling in Taipei MRT Construction .........
........................................................................................................................................................... 196
Eye-Catching Advanced MRT E&M Systems
Data Encryption and Communication Safety in Taipei MRT AFC System ...................................... 214
Discussion of the Installation of Bulk Transformer's OLTC on the Taipei MRT ............................. 224
The Development of Elevator's Earthquake Automatic Diagnosis and Self-reset System ........................232
Reminder for contributing articles