Page 3 - 捷運技術 第44期
P. 3

RAPID TRANSIT SYSTEMS & TECHNOLOGY


                          New Metropolis   New MRT   Striding Towards Twin Golden Cities
                            Special Report on the Taipei MRT“Three Rings & Three Lines”


                                                          Contents



                     Preface

                     New Metropolis

                     ◆ Cultural Characteristics of the Xinzhuang Line New Taipei City Section  ………………………… 01
                     ◆ Twin Taipei City Cooperate to Implement Taipei MRT Network -An Interview with New Taipei
                          City’s Transportation Department Commissioner Simon Shiao-lien Chao  ………………………… 07
                     ◆  Twin Taipei Cities Cooperate to Implement Taipei MRT Network-An Interview with Taipei City
                          Department of Rapid Transit Systems Chief Secretary Chang Tzer-hsiung ………………………… 15
                     ◆ Vision of Future Development in New Taipei Metropolis …………………………………………… 23
                     New MRT-Planning Status

                     ◆  Introduction of the Taipei MRT “Three Rings & Three Lines” ……………………………………… 37
                     ◆ Planned Routes of the Taipei MRT “Three Rings & Three Lines”  ………………………………… 51

                     New MRT-Design Considerations
                     ◆  New Trend for MRT Station Design: Green Construction and Coexistence with the Environment
                          -Taking Taipei MRT Circular Line as an Example ………………………………………………… 71
                     ◆ “Like the clouds swift passage, the dragon travels thousands of miles”
                         -The Public Art on the Circular Line  ……………………………………………………………… 89
                     ◆ MRT Viaduct Structure Design Concept-Taking Taipei MRT Circular Line Phase I Contract
                         DF113 as an Example  …………………………………………………………………………… 109
                     ◆ Design Concept of Noise Control on the MRT Viaduct Section
                        -Taking Taipei MRT Circular Line Phase I Contract DF113 as an Example …………………… 121
                     ◆ Application of Double-decker Viaduct-Taking Taipei MRT Circular Line Contract DF112
                        as an Example  …………………………………………………………………………………… 135

                     New MRT-Advanced Technology
                     ◆  Construction of River-crossing Tunnels and Turnout Work for Taipei MRT
                        -Taking Xinzhuang Line Section Contract CK570C as an Example …………………………… 145
                     ◆ Application of High Flow Concrete on the MRT Project
                        -Taking Xinzhuang Line Section Contract CK570E as an Example  …………………………… 163
                     ◆ Diaphragm Wall Construction on Gravel Stratum
                        -Taking Taipei MRT Contract CD271A as an Example ………………………………………… 171
                     ◆ Construction of Double-O-Tube (DOT) Shield Tunnel-Taking Taiwan Taoyuan International
                          Airport Access MRT System Contract CA450A as an Example  ………………………………… 179
                     ◆ Application of Underpinning on the MRT Project-Taking Taiwan Taoyuan International Airport
                          Line Section Contract CA450A as an Example …………………………………………………… 189
                     ◆ Deep Excavation over a Large Area-Taking Taiwan Taoyuan International Airport Access
                          MRT System's Taipei Main Station as an Example  ……………………………………………… 207
                     ◆ Public Artworks Displayed on the Xinzhuang Line  ……………………………………………… 219

                     Reminder for contributing articles










          01-目錄.indd   2                                                                                         2011/10/21   下午 05:48:57
   1   2   3   4   5   6   7   8