Page 3 - 捷運技術 第44期
P. 3
RAPID TRANSIT SYSTEMS & TECHNOLOGY
New Metropolis New MRT Striding Towards Twin Golden Cities
Special Report on the Taipei MRT“Three Rings & Three Lines”
Contents
Preface
New Metropolis
◆ Cultural Characteristics of the Xinzhuang Line New Taipei City Section ………………………… 01
◆ Twin Taipei City Cooperate to Implement Taipei MRT Network -An Interview with New Taipei
City’s Transportation Department Commissioner Simon Shiao-lien Chao ………………………… 07
◆ Twin Taipei Cities Cooperate to Implement Taipei MRT Network-An Interview with Taipei City
Department of Rapid Transit Systems Chief Secretary Chang Tzer-hsiung ………………………… 15
◆ Vision of Future Development in New Taipei Metropolis …………………………………………… 23
New MRT-Planning Status
◆ Introduction of the Taipei MRT “Three Rings & Three Lines” ……………………………………… 37
◆ Planned Routes of the Taipei MRT “Three Rings & Three Lines” ………………………………… 51
New MRT-Design Considerations
◆ New Trend for MRT Station Design: Green Construction and Coexistence with the Environment
-Taking Taipei MRT Circular Line as an Example ………………………………………………… 71
◆ “Like the clouds swift passage, the dragon travels thousands of miles”
-The Public Art on the Circular Line ……………………………………………………………… 89
◆ MRT Viaduct Structure Design Concept-Taking Taipei MRT Circular Line Phase I Contract
DF113 as an Example …………………………………………………………………………… 109
◆ Design Concept of Noise Control on the MRT Viaduct Section
-Taking Taipei MRT Circular Line Phase I Contract DF113 as an Example …………………… 121
◆ Application of Double-decker Viaduct-Taking Taipei MRT Circular Line Contract DF112
as an Example …………………………………………………………………………………… 135
New MRT-Advanced Technology
◆ Construction of River-crossing Tunnels and Turnout Work for Taipei MRT
-Taking Xinzhuang Line Section Contract CK570C as an Example …………………………… 145
◆ Application of High Flow Concrete on the MRT Project
-Taking Xinzhuang Line Section Contract CK570E as an Example …………………………… 163
◆ Diaphragm Wall Construction on Gravel Stratum
-Taking Taipei MRT Contract CD271A as an Example ………………………………………… 171
◆ Construction of Double-O-Tube (DOT) Shield Tunnel-Taking Taiwan Taoyuan International
Airport Access MRT System Contract CA450A as an Example ………………………………… 179
◆ Application of Underpinning on the MRT Project-Taking Taiwan Taoyuan International Airport
Line Section Contract CA450A as an Example …………………………………………………… 189
◆ Deep Excavation over a Large Area-Taking Taiwan Taoyuan International Airport Access
MRT System's Taipei Main Station as an Example ……………………………………………… 207
◆ Public Artworks Displayed on the Xinzhuang Line ……………………………………………… 219
Reminder for contributing articles
01-目錄.indd 2 2011/10/21 下午 05:48:57