Page 3 - 捷運技術 第40期
P. 3
RAPID TRANSIT SYSTEMS & TECHNOLOGY
Neihu MRT System
Contents
Preface
System Planning and Introduction
The Planning Process of Neihu Line .......................................................................................... 01
Introduction to the Taipei Neihu MRT Line ............................................................................... 26
How to Maintain Smoother Traffic During Neihu Line Construction Period ............................. 40
Art of Elevated Section and Stations
The Beauty of Elevated Station on the Neihu Line ................................................................... 53
Taipei MRT Station Design Combining with Environment - Taking Neihu Line’s
Songshan Airport Station and Dazhi Station as Examples ................................................... 75
Brief Introduction of Neihu Line’s Public Art ............................................................................ 90
Neihu Depot Transformed From a Hill of Garbage ................................................................. 102
The Planning and Design of U-Girder for Viaduct Structures on Neihu Line ......................... 113
Innovation and Integration of E&M System
The Next Generation of Neihu Line’s Vehicle System ............................................................ 127
Retrofit and Integration of the Muzha Line and the Neihu Line .............................................. 137
The Application of CBTC to the Neihu Line ........................................................................... 147
Introduction to the Neihu MRT Line’s Power Supply System ................................................ 156
An Introduction to Neihu Line’s Environmental Control System and Electrical Facilities ..... 167
Precast U-shaped Girders and Joint of Cap Beam
The Manufacture and Installation of Precast U-shaped Girders .............................................. 184
Fatigue Loading Test of of Precast Prestressed Pier Caps and U-Shaped Girders on
the Neihu MRT Line’s Elevated Construction .................................................................... 200
Geotechnical Engineering
Neihu MRT Line Pile Foundation Construction ...................................................................... 208
Non-Destructive Test Case Study of Diaphragm Walls on Neihu MRT Line
Section Contract CB420 ....................................................................................................... 220
Protecting Buildings with Tunnel Grouting for Neihu Line Section Contract CB420 ............ 229
Construction of Underground Dewatering Culverts in Neihu Line Contract CB424B ........... 240