Page 3 - 捷運技術 第40期
P. 3

RAPID TRANSIT SYSTEMS & TECHNOLOGY


                                             Neihu MRT System

                                                   Contents



             Preface


             System Planning and Introduction

             The Planning Process of Neihu Line ..........................................................................................   01
             Introduction to the Taipei Neihu MRT Line ...............................................................................   26

             How to Maintain Smoother Traffic During Neihu Line Construction Period .............................  40

             Art of Elevated Section and Stations

             The Beauty of Elevated Station on the Neihu Line  ...................................................................  53
             Taipei MRT Station Design Combining with Environment - Taking Neihu Line’s
                 Songshan Airport   Station and Dazhi Station as Examples  ................................................... 75

             Brief Introduction of Neihu Line’s Public Art  ............................................................................ 90
             Neihu Depot Transformed From a Hill of Garbage   ................................................................. 102
             The Planning and Design of U-Girder for Viaduct Structures on Neihu Line   ......................... 113


             Innovation and Integration of E&M System

             The Next Generation of Neihu Line’s Vehicle System   ............................................................ 127
             Retrofit and Integration of the Muzha Line and the Neihu Line   .............................................. 137

             The Application of CBTC to the Neihu Line   ........................................................................... 147
             Introduction to the Neihu MRT Line’s Power Supply System   ................................................ 156
             An Introduction to Neihu Line’s Environmental Control System and Electrical Facilities   ..... 167


             Precast U-shaped Girders and Joint of Cap Beam

             The Manufacture and Installation of Precast U-shaped Girders   .............................................. 184
             Fatigue Loading Test of of Precast Prestressed Pier Caps and U-Shaped Girders on
                  the Neihu MRT Line’s Elevated Construction   .................................................................... 200


             Geotechnical Engineering

             Neihu MRT Line Pile Foundation Construction   ...................................................................... 208
             Non-Destructive Test Case Study of Diaphragm Walls on Neihu MRT Line
                 Section Contract CB420   ....................................................................................................... 220

             Protecting Buildings with Tunnel Grouting for Neihu Line Section Contract CB420   ............ 229
             Construction of Underground Dewatering Culverts in Neihu Line Contract CB424B   ........... 240
   1   2   3   4   5   6   7   8