Page 205 - 捷運技術 第59期
P. 205

195




                      Method of the Cross Passage below
                      the Airport in the CB420 Section of

                      the  Taipei MRT Neihu Line,
                      Difficult Cases in MRT Geotechnical

                      Engineering, first edition, pages
                      390-396. 2009.
   200   201   202   203   204   205   206   207   208   209   210