Page 204 - 捷運技術 第59期
P. 204

194




                 Pressure Balanced Shield Tunnel            Machine Repair in the CD551
                 Machine, Difficult Cases in MRT            Section of the Tucheng Line of the

                 Geotechnical Engineering, first            Taipei MRT, Difficult Cases in
                 edition, pages 205-210. 2009.              MRT Geotechnical Engineering,

            [8]  Chang, W., Chan, J., & Cheng, T.,          first edition, pages 240-245. 2009.
                 The Case Study of Shield Tunnel       [12] Liu, A., The Case Study of the
                 Crossing  Multiple Retaining Walls         Shield Tunnel Machine Encountered

                 for Taiwan Railway and High-Speed          with the Steel Sheet Pile in the
                 Railway in CK570B Section of               CL700B Section of the Taipei MRT
                 Taipei MRT  Xinzhuang Line,                Luzhou Line, Difficult Cases in

                 Difficult Cases in MRT Geotechnical        MRT Geotechnical Engineering,
                 Engineering, first edition, pages          first edition, pages 258-265. 2009.
                 211-220. 2009.                        [13] Liu, A., & Chen, I., The Review and

            [9]  Chang, C., Wang, M., Tuan, S., &           Improvement  of Alignment
                 Huang, N., The Case Study on               Deviation of Shield Tunnel Machine

                 Displacement and Restoration of            in CL700B Section of Taipei MRT
                 Shield Tunnel on Banqiao Line of           Luzhou Line, Difficult Cases in
                 Taipei MRT, Difficult Cases in             MRT Geotechnical Engineering,

                 MRT Geotechnical Engineering,              first edition, pages 266-269. 2009.
                 first edition, pages 221-227. 2009.   [14] Chu, H., Chien, C., & Ku, H., The

            [10] Kao, T., Wu, K., & Juan, H., The           Case Study of the Accidents for
                 Case Study of Shield  Tunnel               Water Leakage at the Shield Tail of
                 Crossing Songshan Airport in               Shield Tunnel Machine in the

                 CB420 Section of Neihu Line of             CD551 Section of the Tucheng Line
                 Taipei MRT, Difficult Cases in             of the Taipei MRT, Difficult Cases
                 MRT Geotechnical Engineering,              in MRT Geotechnical Engineering,

                 first edition, pages 235-239. 2009.        first edition, pages 270-278. 2009.
            [11] Chu, H., Tai, C., & Ku, H., The       [15] Kao, T., Wu, K., & Juan, H., The
                 Case Study of the Shield Tunnel            Case Study of Ground Improvement
   199   200   201   202   203   204   205   206   207   208   209