Page 204 - 捷運技術 第59期
P. 204
194
Pressure Balanced Shield Tunnel Machine Repair in the CD551
Machine, Difficult Cases in MRT Section of the Tucheng Line of the
Geotechnical Engineering, first Taipei MRT, Difficult Cases in
edition, pages 205-210. 2009. MRT Geotechnical Engineering,
[8] Chang, W., Chan, J., & Cheng, T., first edition, pages 240-245. 2009.
The Case Study of Shield Tunnel [12] Liu, A., The Case Study of the
Crossing Multiple Retaining Walls Shield Tunnel Machine Encountered
for Taiwan Railway and High-Speed with the Steel Sheet Pile in the
Railway in CK570B Section of CL700B Section of the Taipei MRT
Taipei MRT Xinzhuang Line, Luzhou Line, Difficult Cases in
Difficult Cases in MRT Geotechnical MRT Geotechnical Engineering,
Engineering, first edition, pages first edition, pages 258-265. 2009.
211-220. 2009. [13] Liu, A., & Chen, I., The Review and
[9] Chang, C., Wang, M., Tuan, S., & Improvement of Alignment
Huang, N., The Case Study on Deviation of Shield Tunnel Machine
Displacement and Restoration of in CL700B Section of Taipei MRT
Shield Tunnel on Banqiao Line of Luzhou Line, Difficult Cases in
Taipei MRT, Difficult Cases in MRT Geotechnical Engineering,
MRT Geotechnical Engineering, first edition, pages 266-269. 2009.
first edition, pages 221-227. 2009. [14] Chu, H., Chien, C., & Ku, H., The
[10] Kao, T., Wu, K., & Juan, H., The Case Study of the Accidents for
Case Study of Shield Tunnel Water Leakage at the Shield Tail of
Crossing Songshan Airport in Shield Tunnel Machine in the
CB420 Section of Neihu Line of CD551 Section of the Tucheng Line
Taipei MRT, Difficult Cases in of the Taipei MRT, Difficult Cases
MRT Geotechnical Engineering, in MRT Geotechnical Engineering,
first edition, pages 235-239. 2009. first edition, pages 270-278. 2009.
[11] Chu, H., Tai, C., & Ku, H., The [15] Kao, T., Wu, K., & Juan, H., The
Case Study of the Shield Tunnel Case Study of Ground Improvement