Page 110 - 捷運技術 第56期
P. 110
100
參考文獻 Design and Construction, GSA
Building Information Modeling
[1] 應用 BIM 於建築工程之資源分 Guide Series 04 - 4D Phasing,
配及時程規劃策略研究,內政 Version 1.0. The National 3D-4D-
部建築研究所。2017。 BIM Program, 2009.
[2] 劉安德,臺北捷運計畫時程管 [10] BIM & the 5D Project Cost Manage,
制概論,捷運技術,no.48-1。 Dr. Peter Smith, International Cost
捷運工程局,2014。 Engineering Council(ICEC) &
[3] Synchro PRO Basic Training, University of Technology Sydney
2018. (UTS)PO Box 123, Broadway
[4] U.S. General Services Administration, NSW, Australia, 2007.
GSA.
[5] National Building Specification, REFERENCES
NBS.
[6] America institute of Architects, [1] Research on Resource Allocation
AIA, E202. and Temporation Strategy of BIM
[7] Boton, C., Kubicki, S., Halin, G, in Construction Engineering,
4D/BIM simulation for pre- Architecture and Building Research
construction and construction Institute, Ministry of the Interior,
scheduling. Multiple levels of 2017.
development within a single case [2] Liu Ande. Introduction to schedule
study. Creative Construction control on the Taipei MRT, Rapid
Conference, 2015. Transit Systems and Technology,
[8] U.S. Department of Transportation, no48, Department of Rapid Transit
Federal Highway Administration. Systems, 2014.
Guide for Selecting Projects Suitable [3] Synchro PRO Basic Training,
for 4D Modeling. 2016. 2018.
[9] U.S. General Services Administration, [4] U.S. General Services Administration,
Public Building Service, Office of GSA.