Page 7 - 捷運技術 第43期
P. 7

捷運技術半年刊 第43 期                                              1





                         捷運環狀線規劃歷程與後續全環型路線展望




                                                   1
                                                                               3
                                                                 2
                                          රࣈሬ c˙ʠჾ c௓˿ᅆ
                                                        摘 要


                   ၽ̏ேึਜઠ༶ӻ୕༩ၣΌᐑۨ༩ᇞ͟ᐑًᇞୋɓචݬeᐑًᇞیᐑݬȅᐑݬʿ
              ی̏ᇞה࿴ϓdՉʕᐑًᇞୋɓචݬʊ຾ւБ݁৫֛ࣨdՉቱ༩ݬ֠׵஝ྌ຅ʕd͊ւ

              ֛ࣨf͉˖ڷਗ਼Όᐑ༩ᇞࠇ೥ʫ࢙ᔊࠅ฿ࠑdԨΫᚥᐑًᇞୋɓචݬʘ፬ଣ຾ཀf



              關鍵詞:環狀線、第一階段、南環段、北環段、南北線








                   Perspective of the Planning Process of the MRT Circular Line and the

                                                 Subsequent Routes

                                                                         2
                                                   1
                           Huang Cheng-Hsien   Fang Zen-Fung   Chen Ling-Hui                 3
                                                       Abstract

                   The entire Taipei MRT Circular line consists of the Circular line Phase I, plus the north
              and south sections of the line (regarded as separate projects from Circular line Phase I), and the
              North-South line. So far, Circular line Phase I has received approval from the Executive Yuan
              and the other routes are still been planned and have not been approved yet.

                   This article gives a brief and general introduction of the entire Circular line project and a
              review of the planning process of Circular line Phase I.


              Keywords:c Circular line Phase I, the north and south sections of the Circular line, North-

                          South line















            1c ၽִ̹̏݁ઠ༶ʈ೻҅ၝΥ஝ྌஈਓʈ೻̡ccchhuang@trts.dorts.gov.tw
            2c ၽִ̹̏݁ઠ༶ʈ೻҅ၝΥ஝ྌஈਓʈ೻̡cce1011006@trts.dorts.gov.tw
            3c ၽִ̹̏݁ઠ༶ʈ೻҅ၝΥ஝ྌஈᏍʈ೻̡cc10261@trts.dorts.gov.tw
   2   3   4   5   6   7   8   9   10   11   12