                                                        摘 要


                   ᆑ޷ᎆ༸ዝ຾200εϋٙ຾᜕ၾစආdઢආʈ೻Ҧஔո್޴຅ϓᆞdШʔᆽ֛׌ࠬᎈ
              ͵πίdࠅϓ̌ઢආʥ̀඲᝝޼Ҧঐ߉ॎღᖟdԷνઢආ၍ଣܸࣣٙͪɨ༺Ҧঐdڗಂ

              ˸Ը͟਷̮ʈ೻ࢪ˴ኬdڐϋ਷ʫɛʑ௔ᚃਞʚdШ݊޴ᗫҦঐ݊щॱᆞd˸ʿ݊щᆽ
              Ⴉҁϓ̈೯๟௪€ν઺ҿᅼଡ଼ʷe৅ᇖ߅फʷၾ຾ᐄෂוഃdᆽྼ࠽੻ଉɝᄿعઞী
              ၾрɢf
                   ͉˖ʫ࢙ί׵ઢආ၍ଣϞᗫ௅΅Ъ฿ࠅʧୗdࠠᓃ଄ႊɚࡈ˴ᕚfՉɓdʧୗᆑ޷
              ᎆ༸ઢආᇞҖၾମۨᐑ˪၍ଣٙਿᓾҦஔiՉɚdІ˴ઢආʈЪܸࣣͪɨ༺ٙྼਕЪ
              ุf࿁׵౧කᆑ޷ᎆ༸ઢආ၍ଣྼਕٙෳ।d౤ʺઢආܸࣣͪɨ༺ٙ̌ɢϞқሳ٫d̙
              ீཀ͉ሞ˖ʫ࢙d΍Νઞীၚආᆑ޷ᎆ༸ࠠᓃҦஔၾ၍ଣۜሯf

              ᗫᒟ൚jઢආ၍ଣeମۨᐑ˪

                     Shield Tunnel Excavation Management and Alignment Correction

                                                               2
                                                                                  3
                                         1
                     Wu-Hsun Chang   Rong-Fong Jhan   Guo-Jun Lin    Fu-chun Lin                    4
                                                       Abstract
                   Having accumulated 200 years of experiences and evolutions, excavation technology
               of shield tunnel construction is quite mature but uncertainty and risks still exist. To perform
               successful excavation, further study of technology enhancement and obstacle breakthrough
               are necessary, such as the skill of instructing excavation management. In the past, excavation
               management instruction was conducted by foreign engineers for a long time; while in recent
               years domestic engineers began to get involved. But concerns such as whether related
               technology is sufficiently mature, are their skills are sufficient, and have they prepared
               sufficiently (e.g. Do they have modular teaching materials? Is there a training curriculum and
               management succession?) are worthy of further review and work.
                   This article is an overview of related tunneling management that focuses on two topics.
               First, an introduction of shield tunnel drilling alignment control and the use of tapered
               segments. Second, an instruction book issued regarding practical tunneling operations. In
               regard to practical management methods in starting the shield tunneling machine, for those
               who have the inclination to improve their skill, this thesis discusses streamlining key shield
               tunneling technical and management quality.
               Keywords: excavation management, tapered segment


            1c ၽִ̹̏݁ઠ༶ʈ೻҅یਜʈ೻ஈஈڗcccccccwschang@trts.dorts.gov.tw
            2c ၽִ̹̏݁ઠ༶ʈ೻҅یਜʈ೻ஈਓᐼʈ೻̡ccccjfchan@trts.dorts.gov.tw
            3c ࿲͏ʈ೻ʮ̡อ୿ᇞCK570G݄ʈஈ˴΂cccccc
            4c ɽ௔ʈ೻ʮ̡ڦ່ᇞCR580Aᎆ༸ה˴΂cccccc fuchun@mail.cec.com.tw
   92   93   94   95   96   97   98   99   100   101   102