捷運技術半年刊 第40 期 98年7月 229
捷運內湖線 CB420 區段標灌漿工程在建物保護之應用
1
Ԥ҃ਃ cҽϛ 2
摘 要
ၽ̏ઠ༶ӻ୕ίேึਜ݄ʈdʔ̙ᒒе࿁ቌڐܔيிϓᅂᚤdމᆽڭቌڐܔيʘτ
Όdධʈѩ০࿁ቌڐܔيආБʱؓԨᏝቇٙڭᚐણ݄fઠ༶ʫಳᇞCB420ਜݬᅺ
ІBR1१؇ਉৎdήɨ߈൳ؒʆዚఙeਿඤئת༺B1ԓ१ܝdΎض̏τ༩ЇІ੶ᎆ༸ᐑی
ਉၾ৷ݖݬმટdΌਜε᙮ήɨ༩ݬdՉ݄ʈᗭеிϓήᄴᓔਗd݂ቌڐܔيʘڭᚐɗ͉ᅺ
ɓࠠࠅʘሙᕚf͉ᅺ০࿁ᆑᎆ༸eᑌഖஷ༸eB1ԓ१eܱᔧႊ̈ɺᎆ༸ணࠇεධܔي
ڭᚐણ݄d͉˖ස০࿁B1ԓ१הમ͜ၾᙺᆉᗫʘʈج̋˸ʧୗf
ᗫᒟ൚jܔيڭᚐeฆۨᅸeחᅸe৵๊၍ᙺᆉeήᆵҷԄeܔيҧ͍
Protecting Buildings with Tunnel Grouting for Neihu Line Section
Contract CB420
1
Hung-Wei Juan Chia-Hus Lee 2
Abstract
During the construction of the Taipei MRT system, buildings nearby construction sites are
inevitably affected by the project. Thus, all construction projects are required to conduct safety
analysis and draw up appropriate protection measures. Neihu MRT line Section Contract CB420
begins on the east side of Songshan Airport Station, passes beneath the airport, the Keelung River,
and arrives at Dazhi Station. Then, it continues running along Beian Road and reaches the side of
the roundabout at the southern end of Zhiqian Tunnel where it meets the elevated section. Most
of the section is underground construction which is prone to cause ground disturbances which
can easily impact on the buildings nearby. Consequently, related protective measures are a crucial
subject to be studied. In this section contract, a number of protective measures were applied to
shield tunnels, connection passages, Dazhi Station, the day-lighting section of cut-and-cover
tunnel, etc. Only the grouting method adopted on Dazhi Station is discussed in this article.
Keywords: building protections, micro piles, mixing piles, Tube-A-Manchette grouting, ground
treatment, restoring tilted building