            ᗫᒟ൚jӻ୕዆Υࠇྌd৵तזʮ̡VAL256ӻ୕dᕼˋࠔʮ̡CITYFLO 650ӻ୕




                       Retrofit and Integration of the Muzha Line and the Neihu Line


                                                 Chien-Wen Chiang
                                                       Abstract


                  The original Muzha line adopted the VAL256 system of MATRA. During the tendering phase
             of the Neihu line, to allow a greater number of companies to participate in the said tender and
             achieve the "one train no transfer" requirement of  the Muzha & Neihu whole line, a requirement
             for the retrofitting of the Muzha line's ATC equipment was thus specified in the tendering

             documents. Later it was decided that the Neihu line E&M system subcontract would be performed
             by Bombardier Inc., and the CITYFLO 650 adopted for ATC equipment. The main objective of
             this article is to describe the integration process of the new Neihu line system and the old Muzha

             line system, the relevant equipment items regarding the retrofitting, and the retrofitting plan.
                  Through the step-by-step performance of the said plan, the integration of the new Neihu line
             system and the old Muzha line system will be completed.



             Keywords: system integration plan, VAL256 system of MATRA, CITYFLO 650 of Bombardier









            1   ִ̨̹̏݁ઠ༶ʈ೻҅ዚཥӻ୕ʈ೻ஈ͍೻̡                      cwchiang@trts.dorts.gov.tw
   138   139   140   141   142   143   144   145   146   147   148