66                           Andrea Colini 系統保證歐規與美規之介紹





                 At the end of design phase all safety related documentation required to assure the safety level

            will be organized in a comprehensive document which forms the ¨Safety Case©. Here CENELEC
            has all the advantages that allow to consider that European approach totally covers the U.S. one:

                 ha clear safety case structure;

                 h considerations for the cross-acceptance of safety cases by following a structured standardised
                    life cycle and harmonised documentation set;

                 h support for reuse and modularisation by defining different types of approvals: generic

                    product, generic application and specific application;

                 hconcise independence requirements for designer, verifier, validator and assessor.

                 Main scope of this part of the process is to demonstrate that all the main risk of the Metro
            system are assessed, giving evidence of the fulfilments of the safety requirements and details on

            risk assessment and risk ranking. The document will be updated during the entire life cycle of the

            project.