                                                        摘 要



                   ᐑًᇞዚཥӻ୕ʘ˴ࠅत׌ܼ̍j(1)৷ݖݬމᕐࠐdήɨʿᎆ༸ݬމఊˆఊࠐ(2)І
              ਗʷછՓʘೌɛቷትԓሿ(3)ІਗʷછՓӻ୕ᏐՈϞ݂ღІᒈτΌٙΐԓڭᚐண௪dʿཥ
              ໘છՓЪุӻ୕d˸౤Զᚥ܄τΌکઠٙ؂ਕ(4)ԓ१ணໄ˜ၽژdϾᐑًᇞБԓ္છӻ
              ୕ʘɿӻ୕ܼ̍Іਗΐԓڭᚐɿӻ୕(ATP)eІਗΐԓ዁Ъɿӻ୕(ATO)e္ຖeછՓʿ

              ༟ࣘ՟੻ɿӻ୕(ᔊ၈SCADAɿӻ୕)f
                   ᐑًᇞБԓ္છӻ୕݊Դ͜CBTC(Communication Based Train Control)Ҧஔʿ݂ღІ
              ᒈτΌʘணࠇdͦۃ׵฿ׂணࠇᄲݟ(CDR)චݬd͉˖ਗ਼ʧୗՉ˴ࠅ̌ঐeӻ୕ݖ࿴ʿӻ
              ୕Ⴍ׼dԸઞীၽ̏ᐑًᇞБԓ္છӻ୕f



              關鍵詞:  CBTC技術、自動列車控制系統、自動列車監督、自動列車保護、自動列車操
                         作、監控及資料取得子系統


                             Circular Line Operation Control System Technology

                                                    Chien-Jen Lin

                                                       Abstract

                   Major features of the Circular line E&M system are as follows: (1) double tracks for the

              elevated section while underground tunnel sections use single track (2) driverless, automatically
              controlled vehicles (3) an Automatic Control System with fail-safe train protection equipment
              and a computer-controlled operating system to provide passengers with safe and convenient

              services (4) installation of platform screen doors. Operation Control System of the Circular line
              includes the following sub-systems: Automatic Train Protection system (ATP), Automatic Train
              Operation system (ATO), Supervisory, Control and Data Acquisition system (SCADA).
                   The Circular line's Operation Control System adopts Communication Based Train Control
              (CBTC) and a fail-safe technical design which are currently at the concept design review

              (CDR) stage. This article aims to introduce the main functions, system architecture, and system
              description, and give a further description of the Circular line's Operation Control system.

              Keywords:c Communication Based Train Control (CBTC), Automatic Transfer Switch
                          (ATS), Automatic Train Protection system (ATP), Automatic Train Operation
                          system (ATO), Supervisory, Control and Data Acquisition system (SCADA)