                   ઠ༶อ୿ᇞCK570Hਜݬᅺ؇ژ१ʈ೻d؇ژ१݊อ୿ᇞʿڦ່ᇞٙʹึԓ१dՉʕ

              ϞՇૢอ୿ᇞᎆ༸ஹஷЇʕձᇞٙ̚ڤ१d̤Շૢڦ່ᇞٙᎆ༸݊ஹஷЇ૱˥ᇞٙʕ͍
              ߏׂੀ१dவ̬ૢઠ༶ᎆ༸͟׵ήҖήيٙᗫڷd̀඲ίʕ͍਷ʕࣙٙ؄ψی༩ɨ˙ʹ
              ึࠠᛌ݄ʈdՉ޴ቌᎆ༸௰ટڐஈߒ3md˲ᎆ༸яSҖٙᇞҖd௰ʃ̒ࢰމ200md݂඲
              ΋Бમᙺᆉ˙όආБήᆵҷԄ݄ʈܝdΎආБᎆ༸᝝ઢd˲᝝ઢཀܝdɰ඲ڭᚐ΋Бҁ

              ϓʘᎆ༸dʑ̙ආБܝᚃᎆ༸݄ʈdՉѢᗭܓމ਷ʫί௰दʃਜਹආБεૢᎆ༸ʹɸࠠ
              ᛌ݄ʈࣩdҎᔟ͉͟˖ʘઞীʱؓd౤Զ͉ɺʷ݄ʈ၍ଣਞϽၾᏐ͜f



              ᗫᒟ൚jRJP৷Ꮐᙺᆉeᆑ޷ᎆ༸ઢආၝΥ၍ଣӻ୕f


                           A Multiple Tunnel Crossing Construction Success Story

                                                      1
                                                                        2
                                Chien-Hong Chen   Pon Sn Tsuei   Shih I Chen            3
                                                       Abstract

                   The Xinzhuang line and thd Xinyi line intersect at Dongmen Station, with two of the four
               tunnels connecting to Guting Station on the Zhonghe line and the other two stretching to Chiang

               Kai-shek Memorial Hall Station on the Danshui line.  Due to topographical considerations, the
               crossing of the four tunnels was built beneath Hangzhou South Road near Zhongzheng Junior
               High School.  The closest any of the tunnels come to each other is approximately three meters.
               As the tunnels extend out in an S-shape with a minimum radius of 200meters, grouting ground
               treatment had to be completed before excavation.  After excavation is completed,the tunnel

               needs to be protected before proceeding with the subsequent construction.  By examining the
               difficulties of constructing Taiwan’s first-ever crossed tunnels, this article aims to gain valuable
               suggestions from precursors in related domestic industries so as to assure a safe and efficient

               completion of construction.


               Keywords: RJP high-pressure grouting, integrated management system for shield tunneling



            1c ၽִ̹̏݁ઠ༶ʈ೻҅یਜʈ೻ஈୋ̬ʈਕה˴΂ccccccjerryc@trts.dorts.gov.tw
            2c ၽִ̹̏݁ઠ༶ʈ೻҅یਜʈ೻ஈୋ̬ʈਕה͍ʈ೻̡ccccpstsuei@trts.dorts.gov.tw
            3c ၽִ̹̏݁ઠ༶ʈ೻҅یਜʈ೻ஈୋ̬ʈਕהпଣ஝ྌࢪccctimcheng@trts.dorts.gov.tw
   76   77   78   79   80   81   82   83   84   85   86