Shield Tunnel Construction in the Complex Stratum for Taipei MRT Xinyi
Line between Elephant Mountain Station (R05) and Tail Track Section (R04)
Construction Practice and Contingency in the Complex Stratum
1
2
Bor-Shing Chen Chwen-Jang Liaw Shun-Ta Chiu 3
Abstract
Due to passing through complex soil and rock stratum, the tunnel work of Taipei MRT
Xinyi line between Elephant Mountain Station (R05) and the tail track section (R04) is a highly
challenging job. Therefore, the construction team paid great attention to the planning and
management of the tunnel work to deal with the highly difficult geology. The methods used to
eliminate barriers during the construction process and the precise tunneling management can be
used as a reference for construction in similar stratum.
Keywords: ground treatment, construction barrier