摘 要
ၽ̏ઠ༶อᇞCK570AਜݬᅺʈආБୋɓૢᆑᎆ༸݄ʈࣛd೯ତᆑዚઢ
ආהҁϓʘᆑᎆ༸ߠ෬ᙺᆉˆ(˴ࠅ͜މ෬ᎆ༸ᐑ˪ଡ଼ͭҁϓܝdᐑ˪ၾήɨɺᘎ
ʘ٤ქ)ᚃϞသ˥ʘઋҖdሜݟ೯ତᗳЧߠ෬ᙺᆉˆသ˥ʘઋҖdίʫ̮ᎆ༸ʈ
݄ʈʕࠖϞ೯͛dҷഛ˙جո್ϞѶ˙dШೌج͉࣬༆ӔΎϣဍ˥̙ٙঐfیਜʈ
ஈʈ̡ၾᆑᎆ༸݄ʈᅀਠሜݟʱؓᗫသဍ˥ࡡΪʿҷഛ࿁ഄਖ਼ࣩӺϓ؈dԨ
০࿁อᇞCK570Aਜݬᅺʈᎆ༸ᐑ˪ᙺᆉ၍သဍ˥ҷഛཀe˙جʿഐ؈ආБʱ
ؓઞীd˸ಂϞࣖ༺Ց৷ઠ༶ᆑᎆ༸ʘʈۜሯf
ᗫᒟ൚jသ˥
Practical Grout Plug Sealing Devices for Shield Tunnel Lining Segments at
Xinzhuang Line Taipei City Section—Taking CK570A Project as an Example
2
3
4
1
Wu-Hsun Chang Steve Juang Chee Tong, Ng Chin-Chih Wang
Abstract
During the construction of the down track tunnel for Taipei MRT Xinzhuang line Section
Contract CK570A, water seepage was found from the backfill grout holes (the main purpose
of grouting is to fill the gap between segmental lining and earth after the installation of tunnel
segments) of installed segments. After investigation, it was found that this type of water
leakage from grouting holes commonly occurs in tunnel construction work both domestically
and abroad. A variety of remedial methods to deal with this problem are used but no absolute
solution has been reached. Joint investigation and research was carried out between engineers
of the South District Project Office (SDPO) and tunnel contractor to analyze the cause of
the leakage and come up with a remedial method to deal with it. This article describes the
Xinzhuang line Section Contract CK570A tunnel segment grouting hole leakage improvement
process, method used and result obtained, then further analyzes in a probe aimed at efficiently
upgrading the construction quality of transit system shield tunneling work.
Keyword: water seepage
1c ၽִ̹̏݁ઠ༶ʈ҅یਜʈஈஈڗccccccccccccwschang@trts.dorts.gov.tw
2c ၽִ̹̏݁ઠ༶ʈ҅یਜʈஈҦ͍ࡒୋʞʈਕה˴ccccsteve @trts.dorts.gov.tw
3c ˚ਠɽᔮᐄிٰ΅Ϟࠢʮ̡ၽᝄʱʮ̡CK570Aᅺהڗccccc ng090550@ms3.hinet.net
4c ၽִ̹̏݁ઠ༶ʈ҅یਜʈஈ৷ॴྌࢪcccccccccccwang@trts.dorts.gov.tw