蘆洲線 PLC 監控系統規劃與施工及廠商間之協調
2
1
݄ё cҽߕࢇ
摘 要
͉ਜݬʈϣમ͜ɪɨದʔΝӻ୕d˸ක׳όݖΥdʫ࢙ৰʧୗ͉ϣܔໄண௪
̮dԨʱԮ࿁อᔚᅀਠග๖ஷሜʘ᜕dҎૐᔟϤ᜕ঐ͂ॎ˸ֻఊɓӻ୕˙ঐ༶Бʘ
ܠdಃΣක׳̹ఙᒒеிϓᅀਠዹЦᕹᓙf
ᗫᒟ൚jତఙછՓኜeஷৃ֛
Planning, Construction, and Communication between Contractors for Luzhou
Line’s PLC SCADA System
Yi-Chun Shih , Mei-Chuan Lee 2
1
Abstract
The construction of this section is the first time that different systems are adopted and
integrated with open structure engineering. This article, in addition to giving details of the
equipment used, will share the experience of communication between the new and old contractors,
and shed light on the myth that only single system networks can run smoothly. Meanwhile, it will
contribute to an open market so as to avoid future monopolization by incumbent suppliers.
Keywords: local controller, protocol