                                                        摘 要
                 ேึਜઠ༶ᎆ༸աࠢ׵༩షᄱܓʔԑࣛdՉɪɨБᎆ༸ʘᇞۨ඲နᜊމɪɨࠠᛌۨόd

            ͵඲ৣΥમٜۧ͜όஹഖஷ༸f˸ֻϤᗳʈ೻εમήʕٜટ᝝ઢ݄ጘdא˸ʲۂᅸணໄሤʜ
            ݄Ъd್০࿁ʈѧЪุ٤ග॥ʃʘேึਜdɪࠑʈجʘ༶͜ɪʥᜑѢᗭf͉˖ڷ˸ၽ̏ઠ༶
            ӻ୕ᘻݲᇞCL700AᅺމԷdʧୗஹഖஷ༸ʈجʘ፯͜൙ПeᏀɝӐᇌʈجʧୗʿྼყ݄ʈ

            ࣩԷf͉ʈجʔШ݊ઠ༶ӻ୕࠯ϣˏආʘอҦஔdίၽᝄɺ˝ʈ೻ޢһ᙮௴ᑘf


            ᗫᒟ൚jஹഖஷ༸eሤʜeᏀɝӐᇌʈج







                 New Technology for the Construction of Cross-passages Using the Hydro

                 Pressure Anchor Caisson Method–Taking Luzhou Line Contract CL700A

                                                    as an Example

                                                                               3
                                                            2
                     Chen Lian-sian1, Lee Chang-kuo , Lai Hsu-ming , Chiu Chih-jung                 4
                                                       Abstract

                  In cases where the road width is insufficient for MRT tunnels to lie alongside each other, the
             alignments of the tunnels usually becomes an overlapping linear type with vertical cross-passages.
             In the past, such vertical cross-passages were constructed with on-site drilling method or using
             secant piles as the retaining walls. However, due to the working space in metropolitan areas such
             as Taipei often being small, the application of the aforementioned construction methods was

             still difficult. This article, taking the Taipei MRT Luzhou line Contract CL700A as an example,
             introduces the selection of the construction method for cross-passages, the Hydro Pressure Anchor
             Caisson Method, and its construction processes. This use of the Hydro Pressure Anchor Caisson

             Method is not only the first time for Taipei MRT, but an innovation in civil engineering in Taiwan.


             Keywords: cross-passage, shaft, hydro pressure anchor caisson.



            1c ၽִ̹̏݁ઠ༶ʈ೻҅ʕਜʈ೻ஈɺ˝ୋɧʈਕהᏍʈ೻̡ccx1018157@trts.dorts.gov.tw
            2c ၽִ̹̏݁ઠ༶ʈ೻҅ʕਜʈ೻ஈɺ˝ୋ̬ʈਕהᏍʈ೻̡ccx4048370@trts.dorts.gov.tw
            3c ૶˥Ñ˄̻ݱᑌΥוᜡ݄ʈהᆑ޷ଡ଼ଡ଼ڗcccccccccchmlail05@ms34.hinet.net
            4c ̨ᝄ˰ᘙʈ೻ᚥਪٰ΅Ϟࠢʮ̡͍ʈ೻ࢪccccccccccjackchiu@ceci.com.tw
   108   109   110   111   112   113   114   115   116   117   118