Page 246 - 捷運技術 第40期
        P. 246
     240                       陳俊榮 吳聰易 內湖線 CB424 標地下排水箱涵施工
                                 內湖線 CB424 標地下排水箱涵施工
                                                                        2
                                                          1
                                                ڲ cюᑋ
                                                        摘 要
                 ઠ༶ʫಳᇞCB424ᅺ৷ݖʈცቋ༸༩ʕ̯ɨ˙݅Ϟᕐˆήɨર˥ᇌၾ၍Ї
            ༸༩Շਉd˸л৷ݖਿᓾ݄ʈi͟ʫಳɛɹϓڗҞeʹஷݴඎɽdϾੰྐྵ༩ɧݬ༸
            ༩ɦɤʱद॥(݅Ϟ༸༩ᄱܓස20ʮˉdɛБ༸ۂಯܝᄣމ21ʮˉ)dΌᇞήɨ၍ᇞ፹ၝል
            ᕏd˲݅ϞᇌၾอܔᇌϞʱʹ፹ࠠᛌd̋ɪ݄ʈಂගɦաԣϯಂʔ݄ʈ(සӊϋ12
            ˜1˚Їϋ4˜30˚˸݄ʈ)ʿʹஷφࢤࣛගʔЦኽ༸༩කܱ̈ɺeᆏᙺ૿ኑɺഃഃࠢ
            Փd݂ࡈᇌҷܔዝࣛߒՇϋ̒dίϤ၇၇̮ίૢღᖟɨdᇌ݄ʈཀ࠴މᑙԔf
            ᗫᒟ൚jආܓ၍ଣછՓeԣϯಂ
                     Construction of Underground Dewatering Culverts in Neihu Line
                                                  Contract CB424B
                                          Jun-Jung Chen  Chung-Yi Wu
                                                       Abstract
                  In the elevated bridge construction of Subcontract CB424 of NEI-HU Line project, the
             existing di-plopore drainage slab culvert and the tube underneath KangNing road should be moved
             to both sides of the road before constructing the viaduct foundation of bridge. When moving the
             existing underground facility, DORTS experienced an extremely difficult construction period due
             to rapid population growth, heavy traffic flow, narrow roads, and complicated underground utility
             ducts in Neihu. In addition, the limited construction period from December 1 to April 30 each year
             and no construction during flood season also added to the difficulty of the project.
             Keywords: Progress control, Prevent flood duration
            1   ၽִ̹̏݁ઠ༶ʈ҅؇ਜʈஈਓʈ̡                                   16135@trts.dorts.gov.tw
            2   ၽִ̹̏݁ઠ༶ʈ҅؇ਜʈஈ໌͜৷ॴྌࢪ                                46177@trts.dorts.gov.tw





