Page 174 - 捷運技術 第40期
P. 174

168       劉常修 馮曉岱 魏竹星 賴郁文 陳家鴻 唐力行 陳昆睦 內湖線水電環控工程概述





                    An Introduction to Neihu Line’s Environmental Control System and

                                                 Electrical Facilities

                       Chang-Hsiu Liu  Sheau-Dai Feng  Chu-Hsing Wei  Yu-Wen Lai

                              Chia-Hung Chen  Lee-Hsing Tang  Kum-Mu Chen

                                                       Abstract

                  Since Neihu line is an extension of Muzha line, the design of the E&M system for Neihu line
             shall be integrated with the E&M system of Muzha line. The basic design of both systems has
             similarities in terms of the E&M system and ECS system, such as the ventilation mode - “push and
             pull” which is adopted into tunnel ventilation system, station smoke exhaust system, which comply

             with local fire protection criteria and ECS sub-system designs. In terms of power distribution
             and allocation of emergency power, Neihu line is the same as Muzha line. Moreover, the design
             concepts of control signaling integrated into CCMS and appling the up-to-dated noise control

             standards ect. which has been used in the Xinzhuang and Luzhou lines, are also incorporated
             into Neihu line, and will be presented in this article. A brief introduction of these systems and the
             comparisons of the design variations and improvement methods between Neihu and Muzha lines
             are addressed in this article. Finally, some suggestions and refined feasibility topics of energy
             saving and carbon-dioxide reduction are raised in this article for future design reference.



             Keywords: ventilation mode, emergencg power, noise control, energy saving and carbon-dioxide
                                 reduction
   169   170   171   172   173   174   175   176   177   178   179