Page 174 - 捷運技術 第40期
P. 174
168 劉常修 馮曉岱 魏竹星 賴郁文 陳家鴻 唐力行 陳昆睦 內湖線水電環控工程概述
An Introduction to Neihu Line’s Environmental Control System and
Electrical Facilities
Chang-Hsiu Liu Sheau-Dai Feng Chu-Hsing Wei Yu-Wen Lai
Chia-Hung Chen Lee-Hsing Tang Kum-Mu Chen
Abstract
Since Neihu line is an extension of Muzha line, the design of the E&M system for Neihu line
shall be integrated with the E&M system of Muzha line. The basic design of both systems has
similarities in terms of the E&M system and ECS system, such as the ventilation mode - “push and
pull” which is adopted into tunnel ventilation system, station smoke exhaust system, which comply
with local fire protection criteria and ECS sub-system designs. In terms of power distribution
and allocation of emergency power, Neihu line is the same as Muzha line. Moreover, the design
concepts of control signaling integrated into CCMS and appling the up-to-dated noise control
standards ect. which has been used in the Xinzhuang and Luzhou lines, are also incorporated
into Neihu line, and will be presented in this article. A brief introduction of these systems and the
comparisons of the design variations and improvement methods between Neihu and Muzha lines
are addressed in this article. Finally, some suggestions and refined feasibility topics of energy
saving and carbon-dioxide reduction are raised in this article for future design reference.
Keywords: ventilation mode, emergencg power, noise control, energy saving and carbon-dioxide
reduction