                                                        摘 要



            cc዗ᆃԴ੻޴ཞՇήʘਜਹ੻˸ආБஹഐၾ๖ஷd዗ᆃٙ೯̦࢝စආdՉҿሯ͟˝዗eͩ
            ᎘ආ࢝Ї፻ഊ૿ኑɺ዗ʿ፻࿴዗ഃiɓছʘʕ༨ܓ዗ᆃ(15-30m)ɽεમ͜ෂ୕ŵۨᆃݖணd
            Ϥ၇ɽᆃ͟׵̮ۨ༰މѯᝈdΪϾίൖᙂ౻ᝈɪ༰ʔୌΥცӋdΪϤνО೯࢝ணࠇอٙɽᆃ

            ۨόdΝࣛတԑߕᝈe຾᏶e݄ʈၾഐ࿴ഃʘცӋdϓމ዗ᆃʈ೻ࢪрɢٙͦᅺf
            ccᎇഹ͏଺͛ݺۜሯʘ౤؁d዗ᆃʘணࠇʔස݊ʹஷஹഐʘ̌͜dһ݊͛ݺʕʘᖵஔପ
            ۜi৷ݖ዗ᆃҿࣘʿۨόʘ፯֛̀඲ࡒՈߕኪʿ̌ঐ׌e዗ᆃߗቤঐɢeʹஷላᏘe݄ʈૢ

            ΁ၾʈಂʿ຾᏶ʘϽඎeഐ࿴ʈ೻Ҧஔʘ౤؁eኛࠪʿࣈਗʘԣՓഃΪ९዆᜗ϽඎdΪϤ༰
            Ոᜊʷ˲ሯٙჀ̷ʘ዗ᆃிۨуΪᏐϾ͛f০࿁ʫಳᇞ৷ݖ዗ɽᆃۨόd୚௅ணࠇᚥਪԱኽ
            ɪࠑΪ९ʱؓϽඎၾ༉୚൙Пdܔᙄમ͜Ɓۨᆃʘணࠇf



            ᗫᒟ൚jƁۨᆃ



               The Planning and Design of U-Girder for Viaduct Structures on Neihu Line

                                                            1
                                       Chun-Hung Chen   Chung-Yuan Yu             2
                                                       Abstract

                  I-girder viaduct structure systems have been used for a long time in bridge design however

             since I-girder bridges look gigantic but not elegant, structural engineers and architects have made
             great efforts to develop new viaduct systems for new bridges. The new viaduct systems should
             consider factors such as external beauty, earthquake resistance, impact on local traffic, duration of

             construction, construction cost and manufacturing technology. This article aims to introduce the
             new U-girder system which has been deemed to meet all of the above-mentioned requirements and
             been used on the viaduct structures of the Neihu line.



             Keywords: U-girder









            1   ၽִ̹̏݁ઠ༶ʈ೻҅ɺ˝ܔጘணࠇஈሙڗ                            chchen@trts.dorts.gov.tw
            2   ၽִ̹̏݁ઠ༶ʈ೻҅ɺ˝ܔጘணࠇஈᏍʈ೻̡                          cyyu@trts.dorts.gov.tw
   114   115   116   117   118   119   120   121   122   123   124