Page 299 - 捷運技術 第24期
P. 299

ઠ༶Ҧஔ̒ϋ̊cୋ24ಂc90ϋ2˜                                           293



                 [14].DORTS/GRS, Control Line Diagram R13~R33, Sep.28,1992f
                 [15].SASIB/GRS Railway, Field Test Procedure Series 23.1 AF Track Circuit and CAB
                      Signal Adjustment Test CN332/CP342/CC362, April 01,1996f
                 [16].SASIB/GRS Railway, Field Test Procedure Series 24.4 CAB Signal Level Test
                      CN332/CP342/CC362, April 10,1996f
                 [17].SASIB/GRS Railway, Field Test Series 24.5 Wayside Sighting, Slotting and Clearing
                      Test CN332/CP342/CC362, April 11,1996f
                 [18]. SASIB/GRS Railway, Field Test Procedure Series 24.7 ATO Operation and Platform
                      Function Test CN332/CP342/CC362, April 04,1996f
                 [19].GRSdኪ͛˓̅d૱˥-อֳᇞCT/CH302ࠐࣙΐԓІਗછՓӻ୕ၝ                                                 Sep.
                      14,1995f
                 [20].General Consultant American Transit Consultants,Inc.Particular Technical
                      Specification for CN332/CP342/CC362,1991f
                 [21].GRS, Field Test Procedure Series 24.6 Headway Test CT302/CH302, April 05,1993f
                 [22].̨̏ɽ଺ઠ༶ٰ΅Ϟࠢʮ̡d৷༶ඎӻ୕ᐄ༶ڋಂΐԓ༶Бࠇ೥d88 ϋ08˜14
                      ˚f
                 [23].SASIB, General Instructions for Field System Testing CN332/CP342/CC362 , Feb. 02,
                      1996. P.8f
                 [24].ઠ༶ʮ̡༶ਕ௅dอֳᇞیݬʿؐ዗eیಥᇞᐄ༶ᅼᏝစᇖࠇྌd88ϋ08˜10
                      ˚f
                 [25].ʹஷ௅,ɽ଺ઠ༶جd86ϋ05˜30˚f
                 [26].Behzad Razavi, Design of Analog CMOS Integrated Circuits, Ml Graw Hill, 2000.
                 [27].David E.culler, Jaswinder Pal Singh, Parrallel Computer Architecture, Morgan

                      Kaufmann, 1999f
                 [28].̨̹̏ઠ༶҅ዚཥஈd಻༊༶ᔷ஝֛˓̅ୋɚوd86ϋ12˜f
                 [29].ੵԕ߇e௝̨Έdઠ༶ዚཥӻ୕ʈ೻዆Υd̨̏ઠ༶ɤ඄ϋʈ೻Ҧஔ޼ীึd͏
                      ਷86ϋf
   294   295   296   297   298   299   300   301   302   303   304